{"id":199005,"date":"2025-04-11T18:52:00","date_gmt":"2025-04-11T08:52:00","guid":{"rendered":"https:\/\/railuk.com\/?p=176406"},"modified":"2025-04-11T18:52:00","modified_gmt":"2025-04-11T08:52:00","slug":"world-first-digitally-signalled-steam-loco-begins-testing","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=199005","title":{"rendered":"\u2018World first\u2019 digitally signalled steam loco begins testing"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/signalling-and-telecoms\/world-first-digitally-signalled-steam-loco-begins-testing\/\" title=\"\u2018World first\u2019 digitally signalled steam loco begins testing\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093420\/locomotive-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093420\/locomotive-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093420\/locomotive-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>This week has seen the start of testing at speed for the world\u2019s first operational steam locomotive to be fitted with ETCS (European Train Control System) technology.<\/p>\n<p>Tornado \u2013 a modern steam locomotive built in 2008 \u2013 is the first loco in the charter and heritage pathfinder project for the East Coast Digital Programme (ECDP). In this year of Railway 200, the project is blending steam engineering with digital signalling technology \u2013 the pioneering of the 19<sup>th<\/sup>&nbsp;century meeting the 21<sup>st<\/sup>&nbsp;century.<\/p>\n<p>The pathfinder project was set up to enable all parts of the railway to share in a digital transformation. The introduction of digital signalling, initially to the East Coast Main Line, will create a more efficient, more reliable and even safer railway with lower emissions.<\/p>\n<p>The heritage pathfinder is about the potential for main line operations of steam and heritage diesel to be enjoyed and celebrated by future generations. Heritage rail plays an important role in the UK tourist economy, contributing over \u00a3600m annually.&nbsp;<\/p>\n<p>The fitment has involved a dynamic collaboration involving Hitachi Rail (onboard equipment), AtkinsRealis (fitment design), A1 Steam Locomotive Trust (loco owners) and Network Rail (integration). The project has required overcoming significant challenges around electrical supply, managing braking, both directions running, and enabling the human interface in an environment which is noisy and dusty, sometimes rainy, with vibrations.<\/p>\n<p>The overnight test runs this week have been on the Cambrian line between Shrewsbury and Newtown, in Mid Wales. The Cambrian line was an early pilot of ETCS in this country, completed in 2011. The test trains have been operated by special trains operator West Coast Railway with Govia Thameslink Railway (GTR) providing expertise in the form of the test train officers involved with each trip. This phase of testing is expected to complete on Thursday 17 April.<\/p>\n<p>The process of dynamic testing is intended to provide learnings, and issues and challenges uncovered by this testing phase will be carefully analysed. Later this year, the heritage diesel pathfinder loco, Deltic \u2018Royal Scots Grey\u2019 is also expected to undertake dynamic testing on the Cambrian. Further refining and assurance processes will be involved ahead of any mainline heritage operation in ETCS Level Two.<\/p>\n<p><strong>Ed Akers, Network Rail\u2019s industry partnership director, ECDP, said:<\/strong><\/p>\n<p>\u201cThe innovation and expertise delivered through the Tornado pathfinder has provided significant learnings for our programme, applicable for fitment across a range of fleets.&nbsp;<\/p>\n<p>\u201cThe pathfinder project reflects the \u2018whole railway\u2019 nature of our collaborative ECDP partnership. This week\u2019s testing is an important stage in a process to determine the technical and commercial feasibility of fitment for heritage and charter fleets.\u201d<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"176413\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-1024x683.jpg\" alt=\"\" class=\"wp-image-176413\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-2048x1365.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-630x420.jpg 630w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093512\/LtoR-Rob-Morland-A1-Steam-Trust-Amy-Clouston-AtkinsRealis-Ben-Mason-ECDP-Raymond-Sturton-Hitachi-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"176415\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-1024x683.jpg\" alt=\"\" class=\"wp-image-176415\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-2048x1365.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-630x420.jpg 630w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093513\/Tom-Goulding-Engineering-Degree-Apprentice-Hitachi-and-retired-steam-driver-Ray-Poole-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n<p><strong>Andy Bell, vice president, Hitachi Rail UK, said:<\/strong><\/p>\n<p>\u201cTornado\u2019s retrofit with our ETCS is a world-first that has tested our technology in one of the most complex operating environments. This very special project demonstrates not only the adaptability of Hitachi Rail\u2019s system but also what\u2019s possible when we respect the past while designing for what\u2019s next, combining engineering expertise with deep, trusted partnerships across the industry.<\/p>\n<p>\u201cThe lessons we\u2019ve learned here have created a valuable blueprint for future projects.&nbsp; Carrying forward the relationships, insights, and technical progress from this work will be essential to maintaining momentum, not only for heritage integrations but for wider applications across modern rolling stock as well.\u201d<\/p>\n<p><strong>Alejandro Moreno, AtkinsR\u00e9alis market director \u2013 rail &amp; transit, UK &amp; Ireland, said:<\/strong><\/p>\n<p>\u201cSteam locomotives are more than just machines, they&#8217;re living, breathing monuments to British innovation. We had to find creative solutions to integrate modern technology in an environment which is noisy, dusty, hot and exposed \u2013 all the while preserving Tornado\u2019s authentic character and enabling operation on the digital railway. This world-first project will benefit the entire sector, demonstrating how a collaborative pathfinder approach can solve complex fitment challenges across our evolving railway.\u201d<\/p>\n<p><strong>Rob Morland, electrical engineer, The A1 Steam Locomotive Trust, said:<\/strong><\/p>\n<p>\u201cWe are very pleased that Tornado was selected as the world\u2019s first operational steam locomotive be fitted with ETCS, and have been actively engaged in providing a platform for testing ETCS in this challenging environment.&nbsp;<\/p>\n<p>\u201cWe have extended Tornado\u2019s already comprehensive electrical system to provide the additional power required. This has included the fitment of a second steam turbogenerator, a new axle driven alternator and a third battery bank, dedicated to ETCS. The system is designed to provide a very reliable electrical supply to meet in full the availability requirements of a modern onboard digital signalling system.<\/p>\n<p>\u201cWe\u2019ve also supported the mechanical and design work, undertaking changes to both the tender and engine, and supported the work to install, commission and test the system.\u201d<\/p>\n<p><strong>Matthew Teller, head of systems integration for ERTMS at GTR (one of the test train officers), said:<\/strong><\/p>\n<p>\u201cThis has been both a thrilling experience and a real privilege to support the wider industry in the deployment of ETCS. Having introduced digital signalling on commuter services in London, Govia Thameslink Railway has become an experienced industry leader in ETCS testing, so we\u2019re delighted to be able to collaborate in this way.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/signalling-and-telecoms\/world-first-digitally-signalled-steam-loco-begins-testing\/\" title=\"\u2018World first\u2019 digitally signalled steam loco begins testing\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/04\/11093420\/locomotive-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>This week has seen the start of testing at speed for the world\u2019s first operational steam locomotive to be fitted with ETCS (European Train Control System) technology. Tornado \u2013 a modern steam locomotive built in 2008 \u2013 is the first loco in the charter and heritage pathfinder project for the East Coast Digital Programme (ECDP). [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[11323,1711,47,180,16115,48,85],"tags":[],"class_list":["post-199005","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrification","category-innovation","category-rail-news","category-rolling-stock","category-signalling-and-telecoms","category-technology","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/199005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=199005"}],"version-history":[{"count":4,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/199005\/revisions"}],"predecessor-version":[{"id":199086,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/199005\/revisions\/199086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=199005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=199005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=199005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}