{"id":19853,"date":"2024-03-14T20:14:47","date_gmt":"2024-03-14T10:14:47","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=50818"},"modified":"2024-03-14T20:14:47","modified_gmt":"2024-03-14T10:14:47","slug":"vestas-break-us-record-with-longest-blade-transport-by-rail","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=19853","title":{"rendered":"Vestas break US record with longest blade transport by rail"},"content":{"rendered":"<p><strong>Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres.<\/strong><br \/>\n<span id=\"more-50818\"><\/span>As Vestas claims, these were the longest wind turbine blades transported across major rail service networks in the United States. The transport has been completed in partnership with OmniTRAX, BNSF Railway and Union Pacific Railroad.<\/p>\n<p>OmniTRAX added that it partnered Vestas for this shipment at the origination and the destination. Great Western Railway (GWR) kicked the transport off in Windsor, CO, and the shipment terminated at the company\u2019s Brownsville &amp; Rio Grande International Railway (BRG) at the Port of Brownsville, Texas.<\/p>\n<figure class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid wp-image-50820 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail.jpeg\" alt=\"\" width=\"1200\" height=\"1200\" srcset=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail.jpeg 1200w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail-480x480.jpeg 480w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail-128x128.jpeg 128w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail-768x768.jpeg 768w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail-48x48.jpeg 48w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Vestas-break-US-record-with-longest-blade-transport-by-rail-1024x1024.jpeg 1024w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-caption-text\">Image: \u00a9 Vestas<\/figcaption><\/figure>\n<p>Furthermore, in one of the comments on Vestas\u2019 social media posts, Brian Thomas, VP of Business Development at Barnhart Energy Company said that Barnhart Crane &amp; Rigging\u2019s first turbine erection project was for Vestas in Evanston WY in 2003 when the company railed the V80 blades to site. For reference, the V80 blades have a length of 39 metres.<\/p>\n<p>The V163-4.5 MW turbine reached more than 5 GW of firm orders globally in 2023, including the company\u2019s record 1.1 GW SunZia order in the US. The turbine\u2019s superior park performance significantly enhances business case certainty and has been key to establishing it as the preferred choice for renewable energy projects worldwide, Vestas said.<\/p>\n<p><em><strong>This article was originally published on our sister publication <a href=\"https:\/\/www.projectcargojournal.com\/modalities\/2024\/03\/12\/vestas-break-us-record-with-longest-blade-transport-by-rail\/\"  rel=\"noopener\">ProjectCargoJournal.com<\/a><\/strong><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6239,78,423,6240],"tags":[],"class_list":["post-19853","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-cargo","category-rail-freight","category-united-states","category-vestas"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=19853\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Vestas break US record with longest blade transport by rail - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=19853\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-14T10:14:47+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-14T10:14:47+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Vestas break US record with longest blade transport by rail - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#blogposting\",\"name\":\"Vestas break US record with longest blade transport by rail - VibeWire Magazine\",\"headline\":\"Vestas break US record with longest blade transport by rail\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-03-14T20:14:47+10:00\",\"dateModified\":\"2024-03-14T20:14:47+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#webpage\"},\"articleSection\":\"Project cargo, Rail freight, United States, Vestas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=78#listItem\",\"name\":\"Rail freight\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=78#listItem\",\"position\":2,\"name\":\"Rail freight\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=78\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#listItem\",\"name\":\"Vestas break US record with longest blade transport by rail\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#listItem\",\"position\":3,\"name\":\"Vestas break US record with longest blade transport by rail\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=78#listItem\",\"name\":\"Rail freight\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853\",\"name\":\"Vestas break US record with longest blade transport by rail - VibeWire Magazine\",\"description\":\"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=19853#mainImage\"},\"datePublished\":\"2024-03-14T20:14:47+10:00\",\"dateModified\":\"2024-03-14T20:14:47+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Vestas break US record with longest blade transport by rail - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Vestas break US record with longest blade transport by rail - VibeWire Magazine","description":"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=19853","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=19853#blogposting","name":"Vestas break US record with longest blade transport by rail - VibeWire Magazine","headline":"Vestas break US record with longest blade transport by rail","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-03-14T20:14:47+10:00","dateModified":"2024-03-14T20:14:47+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=19853#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=19853#webpage"},"articleSection":"Project cargo, Rail freight, United States, Vestas"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=19853#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=78#listItem","name":"Rail freight"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=78#listItem","position":2,"name":"Rail freight","item":"https:\/\/www.vibewire.com.au\/?cat=78","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=19853#listItem","name":"Vestas break US record with longest blade transport by rail"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=19853#listItem","position":3,"name":"Vestas break US record with longest blade transport by rail","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=78#listItem","name":"Rail freight"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=19853\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=19853\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=19853#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=19853#webpage","url":"https:\/\/www.vibewire.com.au\/?p=19853","name":"Vestas break US record with longest blade transport by rail - VibeWire Magazine","description":"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=19853#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=19853\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=19853#mainImage"},"datePublished":"2024-03-14T20:14:47+10:00","dateModified":"2024-03-14T20:14:47+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Vestas break US record with longest blade transport by rail - VibeWire Magazine","og:description":"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=19853","article:published_time":"2024-03-14T10:14:47+00:00","article:modified_time":"2024-03-14T10:14:47+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Vestas break US record with longest blade transport by rail - VibeWire Magazine","twitter:description":"Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"19853","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-24 23:31:41","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-14 11:34:29","updated":"2026-05-24 23:31:41"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=78\" title=\"Rail freight\">Rail freight<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tVestas break US record with longest blade transport by rail\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail freight","link":"https:\/\/www.vibewire.com.au\/?cat=78"},{"label":"Vestas break US record with longest blade transport by rail","link":"https:\/\/www.vibewire.com.au\/?p=19853"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/19853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19853"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/19853\/revisions"}],"predecessor-version":[{"id":20134,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/19853\/revisions\/20134"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}