{"id":190515,"date":"2025-03-24T21:47:19","date_gmt":"2025-03-24T11:47:19","guid":{"rendered":"https:\/\/railuk.com\/?p=175697"},"modified":"2025-03-24T21:47:19","modified_gmt":"2025-03-24T11:47:19","slug":"cumbrian-coastline-track-upgrade-planned-for-august","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=190515","title":{"rendered":"Cumbrian coastline track upgrade planned for August"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/cumbrian-coastline-track-upgrade-planned-for-august\/\" title=\"Cumbrian coastline track upgrade planned for August\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/03\/24114129\/Flood-water-in-Whitehaven-tunnel-containing-iron-ochre-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/03\/24114129\/Flood-water-in-Whitehaven-tunnel-containing-iron-ochre-Network-Rail-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/03\/24114129\/Flood-water-in-Whitehaven-tunnel-containing-iron-ochre-Network-Rail-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year.<\/p>\n<p>The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days.<\/p>\n<p>Part of the line has been affected by the ochre-contaminated water flowing from abandoned mines through Bransty tunnel before discharging into Whitehaven Harbour. The discharge of the ochre-contaminated water, first reported in December 2022, is subject to on-going discussions with several public bodies and local stakeholders.<\/p>\n<p>In the interim and separate to these discussions, Network Rail is undertaking the scheduled track renewal works, with the track and drainage in Bransty tunnel being replaced, to ensure its longevity for the future.<\/p>\n<p>The track renewal work is not designed to remedy the dis-colouration of the harbour water which is caused by ochre contaminated water flowing from abandoned mines. The works are part of Network Rail&#8217;s normal track and drainage work bank.<\/p>\n<p>Phil James, North West route director, said: \u201cWe know that local residents are frustrated about the historic mine water in Whitehaven harbour. Our focus is on keeping the railway running safely through Bransty tunnel. We have had to take extra time to carefully plan this work and gain the necessary permissions. We are now fully committed to delivering a full renewal of the track and drainage in August.\u201d<\/p>\n<p>Craig Harrop, regional director for Northern, commented: \u201cWork to protect the reliability of the rail infrastructure is essential for our future service delivery and despite the short-term disruption it might bring, it is always welcome. Customers can rest assured we will put a plan in place to ensure they can still get to where they want to be during the line closure. More details will be released closer to the date.\u201d<\/p>\n<p>Network Rail has been working with the Environment Agency and the Mining Remediation Authority (formerly the Coal Authority) to ensure it has the necessary permits and permissions for the work.<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/cumbrian-coastline-track-upgrade-planned-for-august\/\" title=\"Cumbrian coastline track upgrade planned for August\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/03\/24114129\/Flood-water-in-Whitehaven-tunnel-containing-iron-ochre-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2305,16015,47,16016,913,85],"tags":[],"class_list":["post-190515","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-environment","category-permanent-way","category-rail-news","category-train-operating-companies","category-travel","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=190515\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Cumbrian coastline track upgrade planned for August - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=190515\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-03-24T11:47:19+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-03-24T11:47:19+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Cumbrian coastline track upgrade planned for August - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#blogposting\",\"name\":\"Cumbrian coastline track upgrade planned for August - VibeWire Magazine\",\"headline\":\"Cumbrian coastline track upgrade planned for August\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2025-03-24T21:47:19+10:00\",\"dateModified\":\"2025-03-24T21:47:19+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#webpage\"},\"articleSection\":\"Environment, Permanent Way, Rail News, Train Operating Companies, Travel, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#listItem\",\"name\":\"Cumbrian coastline track upgrade planned for August\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#listItem\",\"position\":3,\"name\":\"Cumbrian coastline track upgrade planned for August\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515\",\"name\":\"Cumbrian coastline track upgrade planned for August - VibeWire Magazine\",\"description\":\"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=190515#mainImage\"},\"datePublished\":\"2025-03-24T21:47:19+10:00\",\"dateModified\":\"2025-03-24T21:47:19+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Cumbrian coastline track upgrade planned for August - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Cumbrian coastline track upgrade planned for August - VibeWire Magazine","description":"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=190515","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=190515#blogposting","name":"Cumbrian coastline track upgrade planned for August - VibeWire Magazine","headline":"Cumbrian coastline track upgrade planned for August","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2025-03-24T21:47:19+10:00","dateModified":"2025-03-24T21:47:19+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=190515#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=190515#webpage"},"articleSection":"Environment, Permanent Way, Rail News, Train Operating Companies, Travel, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=190515#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=190515#listItem","name":"Cumbrian coastline track upgrade planned for August"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=190515#listItem","position":3,"name":"Cumbrian coastline track upgrade planned for August","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=190515\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=190515\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=190515#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=190515#webpage","url":"https:\/\/www.vibewire.com.au\/?p=190515","name":"Cumbrian coastline track upgrade planned for August - VibeWire Magazine","description":"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=190515#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=190515\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=190515#mainImage"},"datePublished":"2025-03-24T21:47:19+10:00","dateModified":"2025-03-24T21:47:19+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Cumbrian coastline track upgrade planned for August - VibeWire Magazine","og:description":"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=190515","article:published_time":"2025-03-24T11:47:19+00:00","article:modified_time":"2025-03-24T11:47:19+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Cumbrian coastline track upgrade planned for August - VibeWire Magazine","twitter:description":"Passengers are being given early notice of plans to replace a section of track on the Cumbrian coastline in August this year. The track renewal work will involve closing the line on the Barrow Coast Route between Sellafield and Workington from 30 August for approximately 23 days. Part of the line has been affected by [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"190515","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-09-09 10:16:42","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-09-09 10:16:42","updated":"2025-09-09 10:16:42"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tCumbrian coastline track upgrade planned for August\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Cumbrian coastline track upgrade planned for August","link":"https:\/\/www.vibewire.com.au\/?p=190515"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/190515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=190515"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/190515\/revisions"}],"predecessor-version":[{"id":190516,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/190515\/revisions\/190516"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=190515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=190515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=190515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}