{"id":18804,"date":"2024-03-10T21:08:00","date_gmt":"2024-03-10T11:08:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=5744f1696dd2a1ed25b60d7e22553ef3"},"modified":"2024-03-10T21:08:00","modified_gmt":"2024-03-10T11:08:00","slug":"east-west-rail-completes-tracklaying-between-oxford-and-bletchley","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=18804","title":{"rendered":"East West Rail completes tracklaying between Oxford and Bletchley"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"1170\" height=\"658\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/03\/Group-Shot-.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"Group Shot\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" \/>For the first time in 50 years Oxford and Bletchley are linked by rail as part of East West Rail which will eventually continue to Cambridge.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the first time in 50 years Oxford and Bletchley are linked by rail as part of East West Rail which will eventually continue to Cambridge.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2491,4191,2598,2407,2009,5993,2305,343,113,5994,2010,2537,2165,2359,5580],"tags":[],"class_list":["post-18804","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bicester","category-bletchley","category-cambridge","category-department-for-transport","category-east-west-rail","category-east-west-rail-alliance","category-environment","category-infrastructure","category-network-rail","category-new-track-construction-train","category-oxford","category-signalling","category-video","category-volkerrail","category-winslow"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/18804","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18804"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/18804\/revisions"}],"predecessor-version":[{"id":18858,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/18804\/revisions\/18858"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18804"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18804"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18804"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}