{"id":1861,"date":"2023-12-07T19:35:00","date_gmt":"2023-12-07T09:35:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=a84956147965f516ac7a254242e1c6fe"},"modified":"2023-12-07T19:35:00","modified_gmt":"2023-12-07T09:35:00","slug":"rail-regulator-says-train-punctuality-and-cancellations-remain-challenging-but-network-rail-starting-to-improve-train-performance","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=1861","title":{"rendered":"Rail regulator says train punctuality and cancellations remain challenging, but Network Rail starting to improve train performance"},"content":{"rendered":"<p><span class=\"field field--name-title field--type-string field--label-hidden\">Rail regulator says train punctuality and cancellations remain challenging, but Network Rail starting to improve train performance<\/span><br \/>\n<span class=\"field field--name-created field--type-created field--label-hidden\"><time datetime=\"2023-12-07T09:35:00+00:00\" title=\"Thursday, 7 December, 2023 - 09:35\" class=\"datetime\">Thu, 07\/12\/2023 &#8211; 09:35<\/time><\/span><br \/>\n<span class=\"orr-published-date\">7 December 2023<\/span><\/p>\n<div class=\"field field--name-field-standfirst field--type-string-long field--label-hidden field__item\">New statistics from the Office of Rail and Road (ORR) released today show Britain\u2019s railway is still not delivering consistently punctual and reliable journeys. However, the regulator\u2019s latest assessment of Network Rail\u2019s performance shows that the company is beginning to turn a corner. <\/div>\n<div class=\"field field--name-field-cover-image field--type-entity-reference field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Cover Image<\/div>\n<div class=\"field__item\">\n<article class=\"media media--type-image media--view-mode-demo-cover\">\n<div class=\"field field--name-field-media-image field--type-image field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Image<\/div>\n<div class=\"field__item\">  <img decoding=\"async\" src=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/styles\/demo_cover\/public\/2023-12\/shutterstock_1286076184.jpg?h=b610ffea&#038;itok=DVwH0O9-\" width=\"2169\" height=\"1220\" alt=\"Photo of UK railway track taken low to the ground. \" loading=\"lazy\" class=\"image-style-demo-cover\" \/><\/div>\n<\/p><\/div>\n<\/article>\n<\/div><\/div>\n<div class=\"clearfix text-formatted field field--name-body field--type-text-with-summary field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Body<\/div>\n<div class=\"field__item\"><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-components field--type-entity-reference-revisions field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Components<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>In the <a href=\"https:\/\/dataportal.orr.gov.uk\/statistics\/performance\/passenger-rail-performance\/\">latest quarter<\/a> (1 July to 30 September 2023), 69.2% of passenger trains were on time, up 1.5 percentage points on the same quarter last year.\u00a0 Against a background of industrial action, the level of cancellations remains high, at 3.5% of passenger services, although slightly better (down 0.6 percentage points) compared with the same quarter last year.<\/p>\n<p>Separate ORR analysis shows that in the last year Network Rail has begun to improve its overall contribution towards day-to-day running of passenger and freight services, with a key measure of delivery showing overall improvement between June and October 2023. This follows the company putting in place regional performance improvement plans, at the request of ORR.<\/p>\n<p>In a <a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2023-12\/orr-mid-year-letter-to-network-rail-on-train-service-performance-2023-12-07.pdf\" data-entity-type=\"media\" data-entity-uuid=\"dc3c02d7-9693-4a9d-92c6-5aebf54e25ef\" data-entity-substitution=\"media\" title=\"Mid-year review of Network Rail\u2019s progress on train performance - December 2023\">letter to Network Rail<\/a>, ORR\u2019s Chief Executive John Larkinson has welcomed the initial recovery but pointed out there is much more still to do to ensure consistent delivery of train services for passengers and freight across the country.<\/p>\n<p>The company must continue to focus on performance of the infrastructure, learning from events including the recent high-profile incident at Plessey viaduct. While extreme weather remains a challenge for the network, the company must do what it can to safely reduce the effect on services.<\/p>\n<p>Network Rail cannot deliver better journeys alone; train operators also have a role to play. For example,\u00a0 more than half of cancelled trains are train operator related. The regulator particularly wants to see Network Rail leading the whole industry in improving the processes that underpin punctuality and reliability, including making widespread use of innovative projects that the company and industry partners have developed with public funding to improve timetabling.<\/p>\n<p>At a regional level, Network Rail\u2019s contribution to train cancellations and punctuality are varied. While improvement is showing through in most, ORR has concerns about performance in the Wales &#038; Western region, where the regulator has recently started an investigation.<\/p>\n<p><strong>Feras Alshaker, Director, Planning and Performance, said:\u00a0<\/strong><\/p>\n<\/div><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"styling-options--alignment--left pull-quote-size--big paragraph paragraph--type--pull-quote paragraph--view-mode--default\">\n<div class=\"pull-quote-container\">\n<div class=\"pull-quote-text\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>\u201cAs the independent regulator, the data we are publishing today bears out the reality that passengers in some areas are still experiencing trains not consistently arriving on time, and high levels of cancellations.\u00a0However, we are beginning to see signs of improvement in Network Rail\u2019s contribution.<\/p>\n<p>\u201cWhile these improvements are promising, they aren\u2019t consistent, and as our analysis shows, the company can do much more to ensure that Britain\u2019s railway provides a reliable and punctual service for all its users.<\/p>\n<p>\u201cWe recognise that ensuring trains run as planned and to time requires cross-industry collaboration. Network Rail can play an essential part in bringing the rail industry together to build on recent performance improvements and we will work with government to strengthen these relationships.\u201d<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\"><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--related-documents paragraph--view-mode--default\">\n<div class=\"field__label\">\n<div class=\"field field--name-field-title field--type-string field--label-hidden page__related page__related--documents field__item\">\n<h2>Downloads<\/h2>\n<\/div><\/div>\n<div class=\"field field--name-field-related-document field--type-entity-reference field--label-hidden page__related page__related--documents field__items doc__items\">\n<div class=\"field__item single-document\">\n<article class=\"file-type--pdf media media--type-document media--view-mode-related-item\">\n<div class=\"field field--name-name field--type-string field--label-hidden field__item\">\n<div class=\"related-document-link\"><a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2023-12\/orr-mid-year-letter-to-network-rail-on-train-service-performance-2023-12-07.pdf\"  class=\"media-link\" title=\"Mid-year review of Network Rail\u2019s progress on train performance - December 2023 (pdf 709.97 KB)\" aria-label=\"Mid-year review of Network Rail\u2019s progress on train performance - December 2023\">Mid-year review of Network Rail\u2019s progress on train performance &#8211; December 2023 (pdf 709.97 KB)<\/a><\/div>\n<p><span class=\"orr-published-date\">Published 7 December 2023<\/span>\n<\/div>\n<div class=\"field field--name-field-media-document field--type-file field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Document<\/div>\n<div class=\"field__item\">\n<div class=\"js-form-item form-item js-form-type-item form-type-item js-form-item- form-item- form-no-label\">\n        PDF 709.97 KB\n        <\/div>\n<\/div><\/div>\n<div class=\"more-info-item\"><a href=\"http:\/\/www.orr.gov.uk\/media\/25020\" class=\"more-info-link media-link\" title=\"More info\" aria-label=\"More info on Mid-year review of Network Rail\u2019s progress on train performance - December 2023\">More info<\/a><\/div>\n<div class=\"download-item\"><a href=\"http:\/\/www.orr.gov.uk\/media\/25020\/download\" class=\"download-link media-link media-download-link\" title=\"Download\" aria-label=\"Download Mid-year review of Network Rail\u2019s progress on train performance - December 2023\">Download<\/a><\/div>\n<\/article>\n<\/div>\n<div class=\"button-contain\">\n          <button class=\"document-related__btn\" aria-label=\"show more documents\">Show more<\/button>\n        <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-related-links field--type-link field--label-above page__related page__related--links\">\n<div class=\"field__label\">Related links<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\"><a href=\"https:\/\/dataportal.orr.gov.uk\/statistics\/performance\/passenger-rail-performance\/\">Passenger rail performance statistical release: July to September 2023<\/a><\/div>\n<\/p><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rail regulator says train punctuality and cancellations remain challenging, but Network Rail starting to improve train performance<br \/>\nThu, 07\/12\/2023 &#8211; 09:35<br \/>\n7 December 2023<\/p>\n<p>            New statistics from the Office of Rail and Road (ORR) released today&#8230;<\/p>\n","protected":false},"author":13,"featured_media":13138,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-1861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1861"}],"version-history":[{"count":5,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1861\/revisions"}],"predecessor-version":[{"id":10514,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/1861\/revisions\/10514"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/13138"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}