{"id":16328,"date":"2023-12-31T10:30:48","date_gmt":"2023-12-31T00:30:48","guid":{"rendered":"https:\/\/www.gslstatus.com\/incidents\/5ht54yzncrc3"},"modified":"2023-12-31T10:30:48","modified_gmt":"2023-12-31T00:30:48","slug":"c2c-singapore-hong-kong-cable-offline","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=16328","title":{"rendered":"C2C Singapore &#8211; Hong Kong Cable Offline"},"content":{"rendered":"<p><small>Dec <var data-var='date'>31<\/var>, <var data-var='time'>00:30<\/var> UTC<\/small><br \/><strong>Resolved<\/strong> &#8211; This cable is now back in normal operation.<\/p>\n<p><small>Dec <var data-var='date'>15<\/var>, <var data-var='time'>18:15<\/var> UTC<\/small><br \/><strong>Update<\/strong> &#8211; The cable fault impacting 3 fiber pairs occurred on 22nd Feb 2023 approximately 30km from Hong Kong Cable Station.  A second service-impacting shunt fault occurred 14th Nov 2023 approximately 50km-96km from Hong Kong Cable Station.  Repairs on the 1st fault scheduled to start 17th Dec 2023 and estimated to complete 25th Dec 2023.<\/p>\n<p><small>Nov <var data-var='date'>13<\/var>, <var data-var='time'>17:14<\/var> UTC<\/small><br \/><strong>Update<\/strong> &#8211; We are continuing to work on a fix for this issue.<\/p>\n<p><small>Nov <var data-var='date'>13<\/var>, <var data-var='time'>17:13<\/var> UTC<\/small><br \/><strong>Identified<\/strong> &#8211; We have observed an outage on the C2C submarine cable system between Singapore and Hong Kong.<br \/>Traffic has automatically redirected via alternative paths. Customers may experience higher latency during this time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dec 31, 00:30 UTCResolved &#8211; This cable is now back in normal operation.Dec 15, 18:15 UTCUpdate &#8211; The cable fault impacting 3 fiber pairs occurred on 22nd Feb 2023 approximately 30km from Hong Kong Cable Station.  A second service-impacting shunt fault&#8230;<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[5512,5511],"tags":[4944],"class_list":["post-16328","post","type-post","status-publish","format-standard","hentry","category-international-ip-transit","category-subsea-cable-systems","tag-telecommunications"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16328"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16328\/revisions"}],"predecessor-version":[{"id":16329,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16328\/revisions\/16329"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}