{"id":16194,"date":"2024-03-01T00:52:48","date_gmt":"2024-02-29T14:52:48","guid":{"rendered":"https:\/\/www.rtands.com\/?p=52710"},"modified":"2024-03-01T00:52:48","modified_gmt":"2024-02-29T14:52:48","slug":"rtd-to-begin-1st-phase-of-light-rail-reconstruction-project-in-may","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=16194","title":{"rendered":"RTD To Begin 1st\u00a0Phase of Light Rail Reconstruction Project in May"},"content":{"rendered":"<p>DENVER \u2013 In the first phase of a multi-phase major reconstruction project of its downtown light rail, RTD will focus on five at-grade rail and street intersections.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/passenger\/rapid-transit-light-rail\/rtd-to-begin-1st-phase-of-light-rail-reconstruction-project-in-may\/\">RTD To Begin 1st\u00a0Phase of Light Rail Reconstruction Project in May<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DENVER \u2013 In the first phase of a multi-phase major reconstruction project of its downtown light rail, RTD will focus on five at-grade rail and street intersections.<br \/>\nThe post RTD To Begin 1st\u00a0Phase of Light Rail Reconstruction Project in May appeared fi&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,1308,49,51,372,5481,4257,58,33],"tags":[],"class_list":["post-16194","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-light-rail-transit","category-passenger","category-passenger-rail","category-rapid-transit-light-rail","category-reconstruction-project","category-rtd","category-track-construction","category-track-structure"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16194"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16194\/revisions"}],"predecessor-version":[{"id":16195,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/16194\/revisions\/16195"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}