{"id":15884,"date":"2024-02-29T03:07:33","date_gmt":"2024-02-28T17:07:33","guid":{"rendered":"https:\/\/www.rtands.com\/?p=52696"},"modified":"2024-02-29T03:07:33","modified_gmt":"2024-02-28T17:07:33","slug":"catchment-wall-construction-begins-in-san-clemente","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=15884","title":{"rendered":"Catchment Wall Construction Begins in San Clemente"},"content":{"rendered":"<p>SAN CLEMENTE \u2013 Two large rigs began drilling so steel beams can be placed 30 feet underground to support the catchment wall in San Clemente.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-structure-2\/bridge-retaining-walls-tunnels\/catchment-wall-construction-begins-in-san-clemente\/\">Catchment Wall Construction Begins in San Clemente<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SAN CLEMENTE \u2013 Two large rigs began drilling so steel beams can be placed 30 feet underground to support the catchment wall in San Clemente.<br \/>\nThe post Catchment Wall Construction Begins in San Clemente appeared first on Railway Track and Structures.<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,29,5420,31,1995,2805,61,49,51,1996,58,63,33],"tags":[9],"class_list":["post-15884","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-bridge-retaining-walls-tunnels","category-catchment-wall","category-class-1","category-metrolink","category-octa","category-off-track-maintenance","category-passenger","category-passenger-rail","category-san-clemente","category-track-construction","category-track-maintenance","category-track-structure","tag-freight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/15884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15884"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/15884\/revisions"}],"predecessor-version":[{"id":15885,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/15884\/revisions\/15885"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}