{"id":154836,"date":"2024-12-05T07:49:02","date_gmt":"2024-12-04T21:49:02","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=118140"},"modified":"2024-12-05T07:49:02","modified_gmt":"2024-12-04T21:49:02","slug":"bridge-works-reach-new-heights-at-calder-park","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=154836","title":{"rendered":"Bridge works reach new heights at Calder Park"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/12\/Calder.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<div id=\"content_container_907202\">\n<p><strong>Works to build the new\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/calder-park-drive-calder-park\">Calder Park Drive road bridge<\/a>\u00a0are ramping up, with the first beams lifted into place.<\/strong><\/p>\n<p><span id=\"more-118140\"><\/span>Crews have positioned seven beams into place on the north side of the <a href=\"https:\/\/www.railexpress.com.au\/last-piece-of-the-puzzle-installed-at-calder-park-drive\/\">road bridge<\/a>, marking a major milestone in works to remove the dangerous and congested Calder Park level crossing.<\/p>\n<p>Manufactured in nearby Melton, the giant beams \u2013 weighing up to 63 tonnes each \u2013 were transported to site overnight to minimise disruption and lifted into place by a 650 tonne crane.<\/p>\n<p>The new road bridge will have 25 beams in total, when it opens in 2025.<\/p>\n<p>The Calder Park Drive level crossing will be gone for good in 2025, making journeys faster and safer, and bringing the Sunbury Line one step closer to being level crossing free in 2025.<\/p>\n<p>The beams were lifted into place by a Demag CC3800 650 tonne Lattice Boom Crawler crane.<\/p>\n<p>The CC3800 possesses a maximum main boom length of 171 metres with a 12m radius, making it a suitable choice for major infrastructure projects, wind turbine construction , maintenance and installation, as well as the petrochemical industry.<\/p>\n<p>The opening of the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/metro-tunnel\">Metro Tunnel<\/a> next year will allow for more services on the Sunbury Line and will give commuters access to 5 new underground stations in Melbourne.<\/p>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/bridge-works-reach-new-heights-at-calder-park\/\">Bridge works reach new heights at Calder Park<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/12\/Calder.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>Works to build the new\u00a0Calder Park Drive road bridge\u00a0are ramping up, with the first beams lifted into place. Crews have \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/bridge-works-reach-new-heights-at-calder-park\/\">Bridge works reach new heights at Calder Park<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163,906],"tags":[10376,8],"class_list":["post-154836","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-state","tag-rail-express","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154836","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=154836"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154836\/revisions"}],"predecessor-version":[{"id":154837,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154836\/revisions\/154837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=154836"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=154836"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=154836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}