{"id":154330,"date":"2024-12-03T20:23:06","date_gmt":"2024-12-03T10:23:06","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=58311"},"modified":"2024-12-03T20:23:06","modified_gmt":"2024-12-03T10:23:06","slug":"feasibility-study-to-reconnect-turin-with-switzerland-is-underway","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=154330","title":{"rendered":"Feasibility study to (re)connect Turin with Switzerland is underway"},"content":{"rendered":"<p><strong>The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality. The country\u2019s infrastructure manager Rete Ferroviaria Italiana (RFI) has finally started a feasibility study, which will last until the first half of next year.<\/strong><br \/>\n<span id=\"more-58311\"><\/span>The Arona-Santhi\u00e0 railway, inaugurated in 1905, stretches for 65 kilometres. Traffic along this line has been suspended since 2012, but new demand for rail freight services pushed for a possible reopening. The infrastructure needs to be revamped as, after it was closed, crossing levels and barriers were removed as well as parts of the tracks and signalling systems.<\/p>\n<p>The feasibility study launched by RFI will cost five million euros, which were allocated in December 2023 and finally approved last summer. Two years ago, cost estimates for a full reopening were set between 36 and 44 million euros. Both the Piedmont region and the Novara province are in favour of a reopening plan, despite it was the former which pushed for the traffic suspension in 2012.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2023\/12\/28\/rfi-to-start-feasibility-study-to-reopen-line-linking-turin-to-switzerland\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2022\/12\/Arona-Santhia-line-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2023\/12\/28\/rfi-to-start-feasibility-study-to-reopen-line-linking-turin-to-switzerland\/\" class=\"readmore-title\">RFI to start feasibility study to reopen line linking Turin to Switzerland<\/a><\/div>\n<\/div>\n<\/aside>\n","protected":false},"excerpt":{"rendered":"<p>The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026<\/p>\n","protected":false},"author":9,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[14637,343,345,47,346,347,350,14638],"tags":[12634],"class_list":["post-154330","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arona-santhia","category-infrastructure","category-italy","category-rail-news","category-rete-ferroviaria-italiana","category-rfi","category-switzerland","category-turin","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=154330\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=154330\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-12-03T10:23:06+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-12-03T10:23:06+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#blogposting\",\"name\":\"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine\",\"headline\":\"Feasibility study to (re)connect Turin with Switzerland is underway\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-12-03T20:23:06+10:00\",\"dateModified\":\"2024-12-03T20:23:06+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#webpage\"},\"articleSection\":\"Arona-Santhi\\u00e0, Infrastructure, Italy, Rail News, Rete Ferroviaria Italiana, RFI, Switzerland, Turin, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#listItem\",\"name\":\"Feasibility study to (re)connect Turin with Switzerland is underway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#listItem\",\"position\":3,\"name\":\"Feasibility study to (re)connect Turin with Switzerland is underway\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330\",\"name\":\"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine\",\"description\":\"The reopening of the Arona-Santhi\\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=154330#mainImage\"},\"datePublished\":\"2024-12-03T20:23:06+10:00\",\"dateModified\":\"2024-12-03T20:23:06+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine","description":"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=154330","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=154330#blogposting","name":"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine","headline":"Feasibility study to (re)connect Turin with Switzerland is underway","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-12-03T20:23:06+10:00","dateModified":"2024-12-03T20:23:06+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=154330#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=154330#webpage"},"articleSection":"Arona-Santhi\u00e0, Infrastructure, Italy, Rail News, Rete Ferroviaria Italiana, RFI, Switzerland, Turin, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=154330#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=154330#listItem","name":"Feasibility study to (re)connect Turin with Switzerland is underway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=154330#listItem","position":3,"name":"Feasibility study to (re)connect Turin with Switzerland is underway","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=154330\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=154330\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=154330#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=154330#webpage","url":"https:\/\/www.vibewire.com.au\/?p=154330","name":"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine","description":"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=154330#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=154330\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=154330#mainImage"},"datePublished":"2024-12-03T20:23:06+10:00","dateModified":"2024-12-03T20:23:06+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine","og:description":"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=154330","article:published_time":"2024-12-03T10:23:06+00:00","article:modified_time":"2024-12-03T10:23:06+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Feasibility study to (re)connect Turin with Switzerland is underway - VibeWire Magazine","twitter:description":"The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"154330","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-09-01 13:09:38","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-09-01 13:09:38","updated":"2025-09-01 13:09:38"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tFeasibility study to (re)connect Turin with Switzerland is underway\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Feasibility study to (re)connect Turin with Switzerland is underway","link":"https:\/\/www.vibewire.com.au\/?p=154330"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=154330"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330\/revisions"}],"predecessor-version":[{"id":154331,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330\/revisions\/154331"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=154330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=154330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=154330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}