{"id":154330,"date":"2024-12-03T20:23:06","date_gmt":"2024-12-03T10:23:06","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=58311"},"modified":"2024-12-03T20:23:06","modified_gmt":"2024-12-03T10:23:06","slug":"feasibility-study-to-reconnect-turin-with-switzerland-is-underway","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=154330","title":{"rendered":"Feasibility study to (re)connect Turin with Switzerland is underway"},"content":{"rendered":"<p><strong>The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality. The country\u2019s infrastructure manager Rete Ferroviaria Italiana (RFI) has finally started a feasibility study, which will last until the first half of next year.<\/strong><br \/>\n<span id=\"more-58311\"><\/span>The Arona-Santhi\u00e0 railway, inaugurated in 1905, stretches for 65 kilometres. Traffic along this line has been suspended since 2012, but new demand for rail freight services pushed for a possible reopening. The infrastructure needs to be revamped as, after it was closed, crossing levels and barriers were removed as well as parts of the tracks and signalling systems.<\/p>\n<p>The feasibility study launched by RFI will cost five million euros, which were allocated in December 2023 and finally approved last summer. Two years ago, cost estimates for a full reopening were set between 36 and 44 million euros. Both the Piedmont region and the Novara province are in favour of a reopening plan, despite it was the former which pushed for the traffic suspension in 2012.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2023\/12\/28\/rfi-to-start-feasibility-study-to-reopen-line-linking-turin-to-switzerland\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2022\/12\/Arona-Santhia-line-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2023\/12\/28\/rfi-to-start-feasibility-study-to-reopen-line-linking-turin-to-switzerland\/\" class=\"readmore-title\">RFI to start feasibility study to reopen line linking Turin to Switzerland<\/a><\/div>\n<\/div>\n<\/aside>\n","protected":false},"excerpt":{"rendered":"<p>The reopening of the Arona-Santhi\u00e0 line in northern Italy, a key missing piece to link Turin with Switzerland, is now one step closer to reality.\u2026<\/p>\n","protected":false},"author":9,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[14637,343,345,47,346,347,350,14638],"tags":[12634],"class_list":["post-154330","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arona-santhia","category-infrastructure","category-italy","category-rail-news","category-rete-ferroviaria-italiana","category-rfi","category-switzerland","category-turin","tag-railfreight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=154330"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330\/revisions"}],"predecessor-version":[{"id":154331,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/154330\/revisions\/154331"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=154330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=154330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=154330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}