{"id":149731,"date":"2024-11-16T00:00:00","date_gmt":"2024-11-15T14:00:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=9214e0cd15fbff34bea617c0be32467c"},"modified":"2024-11-16T00:00:00","modified_gmt":"2024-11-15T14:00:00","slug":"regulator-approves-new-go-op-train-service-between-swindon-taunton-and-weston-super-mare","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=149731","title":{"rendered":"Regulator approves new Go-op train service between Swindon, Taunton and Weston-super-Mare"},"content":{"rendered":"<p><span class=\"field field--name-title field--type-string field--label-hidden\">Regulator approves new Go-op train service between Swindon, Taunton and Weston-super-Mare<\/span><br \/>\n<span class=\"field field--name-created field--type-created field--label-hidden\"><time datetime=\"2024-11-15T14:00:00+00:00\" title=\"Friday, 15 November, 2024 - 14:00\" class=\"datetime\">Fri, 15\/11\/2024 &#8211; 14:00<\/time><br \/>\n<\/span><br \/>\n<span class=\"orr-published-date\">15 November 2024<\/span><\/p>\n<div class=\"field field--name-field-standfirst field--type-string-long field--label-hidden field__item\">The rail regulator has given the go ahead for new train services between Swindon, Taunton and Weston-super-Mare from the end of 2025. The regulator has also set conditions on its approval to ensure the new, co-operatively owned operator has sufficient finance and rolling stock in place in good time. <\/div>\n<div class=\"field field--name-field-cover-image field--type-entity-reference field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Cover Image<\/div>\n<div class=\"field__item\">\n<article class=\"media media--type-image media--view-mode-demo-cover\">\n<div class=\"field field--name-field-media-image field--type-image field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Image<\/div>\n<div class=\"field__item\">  <img decoding=\"async\" src=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/styles\/demo_cover\/public\/2024-11\/access-decision-news-cover.jpg?itok=le3qWJzI\" width=\"1020\" height=\"575\" alt=\"Weston-super-Mare railway station\" loading=\"lazy\" class=\"image-style-demo-cover\" \/><\/p>\n<\/div><\/div>\n<\/article>\n<\/div><\/div>\n<div class=\"clearfix text-formatted field field--name-body field--type-text-with-summary field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Body<\/div>\n<div class=\"field__item\">\n<p>Go-op plans to operate return weekday and weekend services between Taunton and Weston-super-Mare, Taunton and Westbury, Taunton and Swindon, and Frome and Westbury.<\/p>\n<p>It will compete with Great Western Railway (GWR), a public service operator. Go-op plans to start in December 2025 at the earliest, and must do so no later than December 2026 in order to use the capacity ORR has granted.<\/p>\n<p>As part of ORR\u2019s decision, Go-op must provide evidence to ORR of the necessary finance to start operations, fund level crossing enhancements, and that the necessary rolling stock has been secured. ORR\u2019s decision requires Go-op to do this without delay, and no later than November 2025.<\/p>\n<p>In making this decision, the regulator has weighed up the beneficial aspects of this application relating to competition and the introduction of new, better journey opportunities for passengers.<\/p>\n<p>ORR has also taken into account the government\u2019s support for the application, and decided that all these considerations be given greater weight than the anticipated very limited impact on government funds and train service performance.<\/p>\n<p><strong>Martin Jones, Deputy Director, Access, Licensing &amp; International, said:<\/strong><\/p>\n<\/div><\/div>\n<div class=\"field field--name-field-components field--type-entity-reference-revisions field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Components<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\"><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"styling-options--alignment--left pull-quote-size--big paragraph paragraph--type--pull-quote paragraph--view-mode--default\">\n<div class=\"pull-quote-container\">\n<div class=\"pull-quote-text\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>\u201cOur decision gives Go-op the opportunity to bring the first co-operatively owned train service and the first regional open access service in the UK. We think this novel proposal can benefit passengers across Somerset and Wiltshire.<\/p>\n<p>\u201cWe will closely monitor Go-op\u2019s progress towards meeting the financial and rolling stock requirements that are needed before it can bring the services into operation.\u201d&nbsp;<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<h2>Notes to editors<\/h2>\n<ol>\n<li><a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2024-11\/2024-11-15-go-op-s17-decision-letter.pdf\" data-entity-type=\"media\" data-entity-uuid=\"fd20ee4d-a85a-4eab-917d-6a4933529e22\" data-entity-substitution=\"media\">Go-op decision letter<\/a><\/li>\n<li>ORR is the independent safety and economic regulator for Britain\u2019s railways. For track access, we make sure that passenger train companies and freight companies have fair access to the rail network and that best use is made of capacity.&nbsp;<\/li>\n<li>We determine track access applications in line with all our statutory duties as set out mainly in section 4 of the Railways Act 1993. These include, but are not limited to: promoting improvements in railway service performance, promoting the use of the network for passengers and goods and promoting competition for the benefit of rail users.<\/li>\n<\/ol>\n<\/div><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--related-documents paragraph--view-mode--default\">\n<div class=\"field__label\">\n<div class=\"field field--name-field-title field--type-string field--label-hidden page__related page__related--documents field__item\">\n<h2>Downloads<\/h2>\n<\/div><\/div>\n<div class=\"field field--name-field-related-document field--type-entity-reference field--label-hidden page__related page__related--documents field__items doc__items\">\n<div class=\"field__item single-document\">\n<article class=\"file-type--pdf media media--type-document media--view-mode-related-item\">\n<div class=\"field field--name-name field--type-string field--label-hidden field__item\">\n<div class=\"related-document-link\"><a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2024-11\/2024-11-15-go-op-s17-decision-letter.pdf\"  class=\"media-link\" title=\"Application for a new track access contract for services from Go-Op Co-operative Limited: decision letter dated 15 November 2024 (pdf 353.83 KB)\" aria-label=\"Application for a new track access contract for services from Go-Op Co-operative Limited: decision letter dated 15 November 2024\">Application for a new track access contract for services from Go-Op Co-operative Limited: decision letter dated 15 November 2024 (pdf 353.83 KB)<\/a><\/div>\n<p><span class=\"orr-published-date\">Published 15 November 2024<\/span>\n<\/div>\n<div class=\"field field--name-field-media-document field--type-file field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Document<\/div>\n<div class=\"field__item\">\n<div class=\"js-form-item form-item js-form-type-item form-type-item js-form-item- form-item- form-no-label\">\n        PDF 353.83 KB\n        <\/div>\n<\/div><\/div>\n<div class=\"more-info-item\"><a href=\"http:\/\/www.orr.gov.uk\/media\/26352\" class=\"more-info-link media-link\" title=\"More info\" aria-label=\"More info on Application for a new track access contract for services from Go-Op Co-operative Limited: decision letter dated 15 November 2024\">More info<\/a><\/div>\n<div class=\"download-item\"><a href=\"http:\/\/www.orr.gov.uk\/media\/26352\/download\" class=\"download-link media-link media-download-link\" title=\"Download\" aria-label=\"Download Application for a new track access contract for services from Go-Op Co-operative Limited: decision letter dated 15 November 2024\">Download<\/a><\/div>\n<\/article>\n<\/div>\n<div class=\"button-contain\">\n          <button class=\"document-related__btn\" aria-label=\"show more documents\">Show more<\/button>\n        <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Regulator approves new Go-op train service between Swindon, Taunton and Weston-super-Mare<br \/>\nFri, 15\/11\/2024 &#8211; 14:00<\/p>\n<p>15 November 2024<\/p>\n<p>            The rail regulator has given the go ahead for new train services between Swindon, Taunton and Weston-super-&#8230;<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-149731","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149731","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=149731"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149731\/revisions"}],"predecessor-version":[{"id":149939,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149731\/revisions\/149939"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=149731"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=149731"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=149731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}