{"id":149354,"date":"2024-11-12T19:29:33","date_gmt":"2024-11-12T09:29:33","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=57847"},"modified":"2024-11-12T19:29:33","modified_gmt":"2024-11-12T09:29:33","slug":"spain-puts-out-64-7-million-tender-for-algeciras-zaragoza-rolling-highway","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=149354","title":{"rendered":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway"},"content":{"rendered":"<p><strong>The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future Algeciras-Zaragoza rolling highway, for which, however, an opening date remains unknown.<\/strong><br \/>\n<span id=\"more-57847\"><\/span>\u201cThe first of the projects aims to improve the stability of a 7 km long slope along which the road runs, located in Almargen, in the province of Malaga. The second project will adapt the clearance of 21 tunnels to the measurements required for the rolling highway service,\u201d the Spanish ministry of transport. These works will not include the electrification of the line, they will create the space for implementing the needed infrastructure in the future.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/corridors\/2023\/11\/28\/opening-of-algeciras-zaragoza-rolling-highway-postponed-indefinitely\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/11\/Jose%CC%81-Antonio-Sebastia%CC%81n-Ruiz-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/corridors\/2023\/11\/28\/opening-of-algeciras-zaragoza-rolling-highway-postponed-indefinitely\/\" class=\"readmore-title\">Opening of Algeciras-Zaragoza rolling highway postponed indefinitely<\/a><\/div>\n<\/div>\n<\/aside>\n<h2>The Algeciras-Zaragoza rolling highway<\/h2>\n<p>The project to connect Spain\u2019s largest port with the Zaragoza PLAZA Terminal in Zaragoza is one of the major rail freight projects in the country. However, the initiative has been postponed indefinitely due to the lack of available rolling stock and pending works to adapt the infrastructure.<\/p>\n<p>The indefinite postponement of its opening is not the only issue concerning this project. The necessary infrastructure upgrades are causing significant disruptions, causing goods to be transferred onto trucks, leading to a rail freight drop in the port of Algeciras, a trend which is expected to continue in 2025 as well.<\/p>\n<p>The total investment for the Algeciras-Zaragoza rolling highway project should revolve around 472 million euros, 323 of which have already been mobilised. The main actions will include adapting 43 tunnels and 131 overpasses as well as the extension of tracks in 13 stations to accommodate longer freight trains.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/08\/27\/rail-freight-to-spains-largest-port-drops-due-to-rolling-highway-upgrade-works\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/08\/Port-of-Algeciras-1-128x128.jpg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/08\/27\/rail-freight-to-spains-largest-port-drops-due-to-rolling-highway-upgrade-works\/\" class=\"readmore-title\">Rail freight to Spain\u2019s largest port drops due to rolling highway upgrade works<\/a><\/div>\n<\/div>\n<\/aside>\n","protected":false},"excerpt":{"rendered":"<p>The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026<\/p>\n","protected":false},"author":9,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6659,14418,6660,343,47,6662,1024,1104],"tags":[12634],"class_list":["post-149354","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-algeciras","category-algeciras-bobadilla","category-algeciras-zaragoza","category-infrastructure","category-rail-news","category-rolling-highway","category-spain","category-zaragoza","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=149354\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=149354\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-11-12T09:29:33+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-11-12T09:29:33+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#blogposting\",\"name\":\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine\",\"headline\":\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-11-12T19:29:33+10:00\",\"dateModified\":\"2024-11-12T19:29:33+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#webpage\"},\"articleSection\":\"Algeciras, Algeciras-Bobadilla, Algeciras-Zaragoza, Infrastructure, Rail News, Rolling highway, Spain, Zaragoza, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#listItem\",\"name\":\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#listItem\",\"position\":3,\"name\":\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354\",\"name\":\"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine\",\"description\":\"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=149354#mainImage\"},\"datePublished\":\"2024-11-12T19:29:33+10:00\",\"dateModified\":\"2024-11-12T19:29:33+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine","description":"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=149354","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=149354#blogposting","name":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine","headline":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-11-12T19:29:33+10:00","dateModified":"2024-11-12T19:29:33+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=149354#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=149354#webpage"},"articleSection":"Algeciras, Algeciras-Bobadilla, Algeciras-Zaragoza, Infrastructure, Rail News, Rolling highway, Spain, Zaragoza, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=149354#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=149354#listItem","name":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=149354#listItem","position":3,"name":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=149354\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=149354\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=149354#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=149354#webpage","url":"https:\/\/www.vibewire.com.au\/?p=149354","name":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine","description":"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=149354#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=149354\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=149354#mainImage"},"datePublished":"2024-11-12T19:29:33+10:00","dateModified":"2024-11-12T19:29:33+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine","og:description":"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=149354","article:published_time":"2024-11-12T09:29:33+00:00","article:modified_time":"2024-11-12T09:29:33+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway - VibeWire Magazine","twitter:description":"The Spanish government put out a tender worth 64.7 million euros for preparing the Algeciras-Bobadilla railway for rolling highway services. This project concerns the future\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"149354","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-31 12:02:19","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-31 12:02:19","updated":"2025-08-31 12:02:19"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tSpain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Spain puts out 64.7-million tender for Algeciras-Zaragoza rolling highway","link":"https:\/\/www.vibewire.com.au\/?p=149354"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=149354"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149354\/revisions"}],"predecessor-version":[{"id":149355,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/149354\/revisions\/149355"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=149354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=149354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=149354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}