{"id":148822,"date":"2024-09-13T00:20:40","date_gmt":"2024-09-12T14:20:40","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?guid=822845d33f15acac81d4e6d23df36d66"},"modified":"2024-09-13T00:20:40","modified_gmt":"2024-09-12T14:20:40","slug":"orr-authorises-new-bristol-ashley-down-station-ahead-of-public-opening-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=148822","title":{"rendered":"ORR authorises new Bristol Ashley Down station ahead of public opening"},"content":{"rendered":"<p><span class=\"field field--name-title field--type-string field--label-hidden\">ORR authorises new Bristol Ashley Down station ahead of public opening<\/span><br \/>\n<span class=\"field field--name-created field--type-created field--label-hidden\"><time datetime=\"2024-09-12T14:20:40+00:00\" title=\"Thursday, 12 September, 2024 - 14:20\" class=\"datetime\">Thu, 12\/09\/2024 &#8211; 14:20<\/time><br \/>\n<\/span><br \/>\n<span class=\"orr-published-date\">12 September 2024<\/span><\/p>\n<div class=\"field field--name-field-standfirst field--type-string-long field--label-hidden field__item\">The Office of Rail and Road (ORR) has authorised the new Ashley Down railway station ahead of its public opening on Saturday 28 September. The new station will facilitate a new hourly service into Bristol Temple Meads. <\/div>\n<div class=\"field field--name-field-cover-image field--type-entity-reference field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Cover Image<\/div>\n<div class=\"field__item\">\n<article class=\"media media--type-image media--view-mode-demo-cover\">\n<div class=\"field field--name-field-media-image field--type-image field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Image<\/div>\n<div class=\"field__item\">  <img decoding=\"async\" src=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/styles\/demo_cover\/public\/2024-09\/20240823_123550461_iOS-2.jpg?h=6d409df7&amp;itok=SfQUvpBD\" width=\"1365\" height=\"768\" alt=\"Bristol Ashley Down station sign\" loading=\"lazy\" class=\"image-style-demo-cover\" \/><\/p>\n<\/div><\/div>\n<\/article>\n<\/div><\/div>\n<div class=\"clearfix text-formatted field field--name-body field--type-text-with-summary field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Body<\/div>\n<div class=\"field__item\"><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-components field--type-entity-reference-revisions field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Components<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>Ashley Down is part of the MetroWest programme of rail enhancements, which has seen the re-opening of the Henbury Line and new stations at Henbury and North Filton. It is located on the site of the previous Ashley Hill Train station, which closed in 1964.<\/p>\n<p><a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2024-08\/network-rail-ashley-down-station-orr-authorisation%20letter-2024-08-23.pdf\" data-entity-type=\"media\" data-entity-uuid=\"f4615df1-b7b6-4f39-a255-cd50ce416cad\" data-entity-substitution=\"media\">ORR\u2019s authorisation<\/a> of the station covers the construction of two new, 126m long platforms, a sheltered footbridge with lifts and stairs connecting both platforms, shelters, signage, and other works including track realignment.<\/p>\n<p>ORR\u2019s authorisation is a key milestone&nbsp;in getting new, upgraded or renewed infrastructure, such as Ashley Down, ready to open. It confirms that standards on areas like health and safety, accessibility, environmental protection, and reliability and availability have been met.<\/p>\n<p>ORR has worked with Network Rail and the West of England Combined Authority from the outset of the project to support them through the authorisation process, ensuring that important checks and surveys are carried out.<\/p>\n<p><strong>Giles Turner, Head of Interoperability and Rail Vehicle Engineering at ORR, said:&nbsp;<\/strong><\/p>\n<\/div><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"styling-options--alignment--left pull-quote-size--big paragraph paragraph--type--pull-quote paragraph--view-mode--default\">\n<div class=\"pull-quote-container\">\n<div class=\"pull-quote-text\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>This is a significant upgrade for connectivity in and around Bristol and we look forward to seeing the station open for passengers shortly.&nbsp;<\/p>\n<p>We\u2019re pleased to have played our part in getting Ashley Down ready to open. Our team worked closely with both Network Rail and the West of England Combined Authority to support them through the authorisation process, just as we do for new trains and infrastructure across the country.<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p><strong>Notes to editor<\/strong><\/p>\n<ol>\n<li><a href=\"https:\/\/www.orr.gov.uk\/guidance-compliance\/rail\/health-safety\/laws\/interoperability\/authorisations\">ORR authorises new and upgraded infrastructure<\/a>&nbsp;like Ashley Down as part of its responsibility to authorise infrastructure and rolling stock that are new or have had a major upgrade or renewal.<\/li>\n<li>Photo from GWR<\/li>\n<li><a href=\"https:\/\/travelwest.info\/app\/uploads\/2023\/10\/Map-metrowest-Ashley-Down.pdf\">Map of the MetroWest scheme<\/a><\/li>\n<li><a href=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/2024-08\/network-rail-ashley-down-station-orr-authorisation%20letter-2024-08-23.pdf\" data-entity-type=\"media\" data-entity-uuid=\"f4615df1-b7b6-4f39-a255-cd50ce416cad\" data-entity-substitution=\"media\">Letter of authorisation<\/a><\/li>\n<\/ol>\n<\/div><\/div>\n<\/div><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-related-links field--type-link field--label-above page__related page__related--links\">\n<div class=\"field__label\">Related links<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\"><a href=\"http:\/\/www.orr.gov.uk\/guidance-compliance\/rail\/health-safety\/laws\/interoperability\/authorisations\">Interoperability authorisations<\/a><\/div>\n<\/p><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>ORR authorises new Bristol Ashley Down station ahead of public opening<br \/>\nThu, 12\/09\/2024 &#8211; 14:20<\/p>\n<p>12 September 2024<\/p>\n<p>            The Office of Rail and Road (ORR) has authorised the new Ashley Down railway station ahead of its public opening on Saturday &#8230;<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-148822","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/148822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=148822"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/148822\/revisions"}],"predecessor-version":[{"id":148823,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/148822\/revisions\/148823"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=148822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=148822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=148822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}