{"id":14640,"date":"2024-02-24T11:37:29","date_gmt":"2024-02-24T01:37:29","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=14640"},"modified":"2024-02-24T11:37:29","modified_gmt":"2024-02-24T01:37:29","slug":"afghanistan-uzbekistan-line-reconstruction-starts","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=14640","title":{"rendered":"Afghanistan &#8211; Uzbekistan line reconstruction starts"},"content":{"rendered":"<p>RECONSTRUCTION of the 75km line linking Afghanistan and Uzbekistan began on February 21, according to the Bakhtar news agency.<\/p>\n<p>Built more than a decade ago, the cross-border line has been damaged and out of use due to conflict in the region.<\/p>\n<p>The rebuilding work is expected to complete within three months, at a cost of $US 6.3m.<\/p>\n<p>Last year the governments of Uzbekistan, Afghanistan and Pakistan signed a joint protocol setting out their intention to build a 760km UAP Railway connecting the three countries.<\/p>\n<p>This line could open in 2027 and estimates suggest it could carry 15 million tonnes of freight a year by 2030.<\/p>\n<p><em>For details of projects across the globe, subscribe to <a href=\"https:\/\/irjpro.com\/\" target=\"_blank\" rel=\"noopener\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/freight\/afghanistan-uzbekistan-line-reconstruction-starts\/\">Afghanistan &#8211; Uzbekistan line reconstruction starts<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>RECONSTRUCTION of the 75km line linking Afghanistan and Uzbekistan began on February 21, according to the Bakhtar news agency. Built more than a decade ago, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-14640","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/14640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14640"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/14640\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}