{"id":145218,"date":"2024-10-30T10:01:59","date_gmt":"2024-10-30T00:01:59","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117792"},"modified":"2024-10-30T10:01:59","modified_gmt":"2024-10-30T00:01:59","slug":"work-to-start-on-griffith-station-upgrade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=145218","title":{"rendered":"Work to start on Griffith Station upgrade"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Griffith.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>IMAGE:Leonid Andronov\/stock.adobe.com<\/figcaption><\/figure>\n<div class=\"node-section-pre-content\">\n<div class=\"node-content__element node-content__element--summary nsw-intro\">\n<div class=\"nsw-wysiwyg-content\">\n<p><strong>Work to make Griffith Station safer and more accessible will soon begin after the New South Wales Government signed off on <a href=\"https:\/\/www.transport.nsw.gov.au\/projects\/current-projects\/griffith-station-upgrade\">upgrade plans<\/a>.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<p><span id=\"more-117792\"><\/span><\/p>\n<div class=\"node-section-content\">\n<div class=\"node-content__element\">\n<div class=\"nsw-wysiwyg-content\">\n<p>A new coach bay, bus shelter and accessible car space will be constructed, along with a new accessible path from the station to the car park.<\/p>\n<p>The upgrades will include:<\/p>\n<p>\u2022 a new boarding zone<\/p>\n<p>\u2022 tactile indicators<\/p>\n<p>\u2022 new ambulant toilets<\/p>\n<p>\u2022 upgrades to existing ramps<\/p>\n<p>\u2022 modification to the ticket counter and waiting room and<\/p>\n<p>\u2022 improvements to wayfinding and lighting.<\/p>\n<p>Minister for Transport Jo Haylen said public transport should be safe and accessible places for everyone.<\/p>\n<p>&#8220;That\u2019s why the New South Wales Government is investing $800 million in the new Safe Accessible Transport Program, to make sure our <a href=\"https:\/\/www.railexpress.com.au\/rail-industry-news-australia-new-zealand\/industry-infrastructure\/train-stations\/\">public transport<\/a> is as safe and inclusive as possible,&#8221; she said<\/p>\n<p>Made possible thanks to the $800 million Safe Accessible Transport program, the Griffith station upgrade will ensure local transport is made more inclusive for people with disabilities and other mobility challenges.<\/p>\n<p>Minister for Regional Transport and Roads Jenny Aitchison said regional communities like Griffith have had to wait too long for accessibility upgrades and the government is acting to right this wrong and improve access.<\/p>\n<p>\u201cThe work we are doing at regional stations like Griffith won\u2019t just improve access to public transport; it\u2019ll mean passengers with disabilities and mobility challenges will have better access to healthcare, education and job opportunities that all enrich our regional communities,\u201d she said.<\/p>\n<p>Joss Group has been awarded the construction contract, with work to start in late 2024 and be completed by mid-2025, weather permitting.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/work-to-start-on-griffith-station-upgrade\/\">Work to start on Griffith Station upgrade<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Griffith.jpeg\" alt=\"\"><figcaption>IMAGE:Leonid Andronov\/stock.adobe.com<\/figcaption><\/figure>\n<p>Work to make Griffith Station safer and more accessible will soon begin after the New South Wales Government signed off \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/work-to-start-on-griffith-station-upgrade\/\">Work to start on Griffith Station upgrade<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,184,2251,163,906,10574,164],"tags":[10376],"class_list":["post-145218","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-industry-safety","category-nsw","category-rail-industry-news-australia-new-zealand","category-state","category-station-design","category-train-stations","tag-rail-express"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/145218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=145218"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/145218\/revisions"}],"predecessor-version":[{"id":145219,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/145218\/revisions\/145219"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=145218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=145218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=145218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}