{"id":144844,"date":"2024-10-29T07:01:54","date_gmt":"2024-10-28T21:01:54","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117779"},"modified":"2024-10-29T07:01:54","modified_gmt":"2024-10-28T21:01:54","slug":"track-laid-during-shutdown","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=144844","title":{"rendered":"Track laid during shutdown"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/241022-Artboard-Regional-Trackworks.png\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/ARC infrastructure<\/figcaption><\/figure>\n<p><strong>Arc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on the Arc network.\u00a0<\/strong><span id=\"more-117779\"><\/span><\/p>\n<p>The extended network shut period had been scheduled to accommodate critical major turnout\u00a0replacements in Moondyne, as well as <a href=\"https:\/\/www.railexpress.com.au\/major-works-start-at-metronet-new-midland-station\/\">METRONET<\/a> works for the\u00a0<a href=\"https:\/\/www.metronet.wa.gov.au\/projects\/new-midland-station\">New Midland Station<\/a>.<\/p>\n<p><strong>Central<\/strong><br \/>\nIn the Central region, works included laying 2.7 kilometres of new 60 kilogram rail between Grass Valley and Carrabin, in addition to a full level crossing upgrade at Grass Valley. The team also completed the replacement of an end-of-life turnout at Carrabin.<\/p>\n<p>The Central team works consisted of approximately 100 rail cuts, 60 Thermit welds, and 500 tonnes of ballast dropped. To complete the required activities the works required 1500 labour hours (Arc and Contractors), use of the turnout laying system, six loaders, three excavators, two backhoes and two suites of track machines.<\/p>\n<p>The Rail Recovery Team provided assistance to the Central team during the works.<\/p>\n<p><strong>Goldfields<\/strong><br \/>\nIn the Goldfields region, the team completed works on the Beaton Road level crossing near Southern Cross.<\/p>\n<p>The Goldfields team also completed an upgrade at Jaurdi Loop, which involved removing more than 1km of track prior to laying more than 1,500 new concrete sleepers and installing the new track.<\/p>\n<p>A further 1,000 concrete sleepers were being laid following the shut.<\/p>\n<p><strong>Metro<\/strong><br \/>\nThe Metro team works involved rerailing and rail destressing at multiple locations during the shut period. In total, 850m of track was rerailed at three different locations.<\/p>\n<p>The Track team was also responsible for supervising two sites where powerlines and poles were replaced.<\/p>\n<p>Head of Maintenance Delivery Tim Linton said the teams had worked hard to complete large volumes of work at different locations across their regional areas.<\/p>\n<p>\u201cThere has been a lot of coordination between our regions to achieve this significant scope of work, with support from the Maintenance Support planning team.\u201d<\/p>\n<p>\u201cIt\u2019s the collaborative effort between all the teams which enabled this much work to take place, as it required intricate planning to ensure track machines could get to the correct locations and for resources to be allocated appropriately.\u201d<\/p>\n<p>The 86-hour \u2018mega\u2019 shut occurred from Tuesday 1 to Friday 4 October 2024.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/track-laid-during-shutdown\/\">Track laid during shutdown<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/241022-Artboard-Regional-Trackworks.png\" alt=\"\"><figcaption>Image\/ARC infrastructure<\/figcaption><\/figure>\n<p>Arc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/track-laid-during-shutdown\/\">Track laid during shutdown<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[10519,10520,166,163,906],"tags":[10376,4553],"class_list":["post-144844","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maintenance-and-repairs","category-operations-maintenance","category-operations-and-maintenance","category-rail-industry-news-australia-new-zealand","category-state","tag-rail-express","tag-western-australia"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=144844\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Track laid during shutdown - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=144844\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-28T21:01:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-28T21:01:54+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Track laid during shutdown - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#blogposting\",\"name\":\"Track laid during shutdown - VibeWire Magazine\",\"headline\":\"Track laid during shutdown\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-10-29T07:01:54+10:00\",\"dateModified\":\"2024-10-29T07:01:54+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#webpage\"},\"articleSection\":\"Maintenance and Repairs, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), State, Rail Express, Western Australia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#listItem\",\"name\":\"Track laid during shutdown\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#listItem\",\"position\":3,\"name\":\"Track laid during shutdown\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844\",\"name\":\"Track laid during shutdown - VibeWire Magazine\",\"description\":\"Image\\\/ARC infrastructureArc Infrastructure\\u2019s Regional teams \\u2013 Central, Goldfields and Metro \\u2013 undertook key maintenance works during the recent 86-hour shut on \\u2026 The post Track laid during shutdown appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=144844#mainImage\"},\"datePublished\":\"2024-10-29T07:01:54+10:00\",\"dateModified\":\"2024-10-29T07:01:54+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Track laid during shutdown - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Track laid during shutdown - VibeWire Magazine","description":"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=144844","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=144844#blogposting","name":"Track laid during shutdown - VibeWire Magazine","headline":"Track laid during shutdown","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-10-29T07:01:54+10:00","dateModified":"2024-10-29T07:01:54+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=144844#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=144844#webpage"},"articleSection":"Maintenance and Repairs, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), State, Rail Express, Western Australia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=144844#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=144844#listItem","name":"Track laid during shutdown"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=144844#listItem","position":3,"name":"Track laid during shutdown","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=144844\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=144844\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=144844#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=144844#webpage","url":"https:\/\/www.vibewire.com.au\/?p=144844","name":"Track laid during shutdown - VibeWire Magazine","description":"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=144844#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=144844\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=144844#mainImage"},"datePublished":"2024-10-29T07:01:54+10:00","dateModified":"2024-10-29T07:01:54+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Track laid during shutdown - VibeWire Magazine","og:description":"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=144844","article:published_time":"2024-10-28T21:01:54+00:00","article:modified_time":"2024-10-28T21:01:54+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Track laid during shutdown - VibeWire Magazine","twitter:description":"Image\/ARC infrastructureArc Infrastructure\u2019s Regional teams \u2013 Central, Goldfields and Metro \u2013 undertook key maintenance works during the recent 86-hour shut on \u2026 The post Track laid during shutdown appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"144844","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-31 05:03:37","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-31 05:03:37","updated":"2025-08-31 05:03:37"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTrack laid during shutdown\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Track laid during shutdown","link":"https:\/\/www.vibewire.com.au\/?p=144844"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/144844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=144844"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/144844\/revisions"}],"predecessor-version":[{"id":144845,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/144844\/revisions\/144845"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=144844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=144844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=144844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}