{"id":14324,"date":"2024-02-23T10:37:41","date_gmt":"2024-02-23T00:37:41","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=14324"},"modified":"2024-02-23T10:37:41","modified_gmt":"2024-02-23T00:37:41","slug":"pt-kai-takes-chinese-loans-for-whoosh-cost-overrun","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=14324","title":{"rendered":"PT KAI takes Chinese loans for Whoosh cost overrun"},"content":{"rendered":"<p>PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October.<\/p>\n<p>Two loan agreements were confirmed on February 7, the first for $US 231m and the second for $US 217m, at interest rates of between 3.7 and 3.8%.<\/p>\n<p>Originally costed at $US 6.07bn, the project to build a 42.3km high-speed line linking Jakarta and Bandung with a maximum speed of 350km\/h has actually cost nearly $US 2bn more due to technical issues, the unstable nature of civil works and land acquisition difficulties.<\/p>\n<p>The line was constructed by PT Kereta Cepat Indonesia-China (KCIC), a 60:40 Indonesian-Chinese consortium of state-owned Indonesian companies and China Railway Engineering and other Chinese companies. The line has entirely adopted Chinese railway equipment, the first time China has exported all the technology for an international high-speed project.<\/p>\n<p>Whoosh services are operated with 12 eight-car CR400AF Yawan high-speed trains supplied by CRRC.<\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/financial\/pt-kai-takes-chinese-loans-for-whoosh-cost-overrun\/\">PT KAI takes Chinese loans for Whoosh cost overrun<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-14324","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=14324\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=14324\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-23T00:37:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-23T00:37:41+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#blogposting\",\"name\":\"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine\",\"headline\":\"PT KAI takes Chinese loans for Whoosh cost overrun\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-02-23T10:37:41+10:00\",\"dateModified\":\"2024-02-23T10:37:41+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#webpage\"},\"articleSection\":\"Rail News, TRANSPORT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"position\":2,\"name\":\"TRANSPORT\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#listItem\",\"name\":\"PT KAI takes Chinese loans for Whoosh cost overrun\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#listItem\",\"position\":3,\"name\":\"PT KAI takes Chinese loans for Whoosh cost overrun\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324\",\"name\":\"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine\",\"description\":\"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=14324#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"datePublished\":\"2024-02-23T10:37:41+10:00\",\"dateModified\":\"2024-02-23T10:37:41+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine","description":"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for","canonical_url":"https:\/\/www.vibewire.com.au\/?p=14324","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=14324#blogposting","name":"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine","headline":"PT KAI takes Chinese loans for Whoosh cost overrun","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-02-23T10:37:41+10:00","dateModified":"2024-02-23T10:37:41+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=14324#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=14324#webpage"},"articleSection":"Rail News, TRANSPORT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=14324#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","position":2,"name":"TRANSPORT","item":"https:\/\/www.vibewire.com.au\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=14324#listItem","name":"PT KAI takes Chinese loans for Whoosh cost overrun"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=14324#listItem","position":3,"name":"PT KAI takes Chinese loans for Whoosh cost overrun","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=14324\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=14324\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=14324#webpage","url":"https:\/\/www.vibewire.com.au\/?p=14324","name":"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine","description":"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=14324#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"datePublished":"2024-02-23T10:37:41+10:00","dateModified":"2024-02-23T10:37:41+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine","og:description":"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for","og:url":"https:\/\/www.vibewire.com.au\/?p=14324","article:published_time":"2024-02-23T00:37:41+00:00","article:modified_time":"2024-02-23T00:37:41+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"PT KAI takes Chinese loans for Whoosh cost overrun - VibeWire Magazine","twitter:description":"PT KAI, the state railway of Indonesia, has taken on loans totalling $US 448m from China Development Bank (CDB) to help pay for a cost overrun incurred by the construction of the country\u2019s first high-speed train line, known as Whoosh, which opened in October. Two loan agreements were confirmed on February 7, the first for","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"14324","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-22 22:25:39","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-02-23 10:39:23","updated":"2026-05-22 22:25:39"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=5\" title=\"TRANSPORT\">TRANSPORT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tPT KAI takes Chinese loans for Whoosh cost overrun\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"TRANSPORT","link":"https:\/\/www.vibewire.com.au\/?cat=5"},{"label":"PT KAI takes Chinese loans for Whoosh cost overrun","link":"https:\/\/www.vibewire.com.au\/?p=14324"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/14324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14324"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/14324\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}