{"id":142128,"date":"2024-10-21T08:18:17","date_gmt":"2024-10-20T22:18:17","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117711"},"modified":"2024-10-21T08:18:17","modified_gmt":"2024-10-20T22:18:17","slug":"train-travels-through-cross-river-rail-tunnels","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=142128","title":{"rendered":"Train travels through Cross River Rail tunnels"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Cross-River-Rail-First-Train-Roma-Street-01-1.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Cross River Rail<\/figcaption><\/figure>\n<p><strong>In a milestone for the Cross River Rail project, a train has entered one of the <a href=\"https:\/\/crossriverrail.qld.gov.au\/\">project<\/a>\u2019s twin tunnels and pulled up to one of the new underground station platforms.<\/strong><span id=\"more-117711\"><\/span><\/p>\n<p>The train travelled almost four-kilometres from the Mayne Yard stabling facility to the new Roma Street underground station platform, forming a \u201cproof of concept\u201d and setting up the project for success ahead of its final testing and commissioning phase.<\/p>\n<p>The proof of concept involved the train entering the tunnel at low speed \u2013 approximately five kilometres per hour \u2013 and using minimal power to conduct several critical tests.<\/p>\n<p>These included testing overhead power systems with the train and safe movement through the tunnel.<\/p>\n<p>Cross River Rail Delivery Authority CEO Graeme Newton said the test paves the way for testing of different and more complex systems across the project.<\/p>\n<p>\u201cFollowing the proof of concept, crews will prepare for more rigorous testing across the remaining tunnel and station areas,\u201d Newton said.<\/p>\n<p>\u201cThese tests will start with validating individual systems and gradually expand to test multiple systems at the same time before full capacity timetable testing prior to opening to the public.<\/p>\n<p>\u201cWhile the massive feats of engineering we saw during Cross River Rail\u2019s <a href=\"https:\/\/www.railexpress.com.au\/track-closures-for-cross-river-rail\/\">construction<\/a> phase were impressive, the methodical and rigorous period of testing and commissioning we\u2019re now entering into will be just as crucial to the project\u2019s success.\u201d<\/p>\n<p>The proof of concept was made possible after the section of tunnel north of the Roma Street underground station was energised, using around 4.5km of rigid overhead conductor bars to provide 25 kilovolts of power to the train.<\/p>\n<p>Overall, there will be thousands of tests performed for the Cross River Rail tunnels and stations, including testing the fire protection and detection systems, communications, lighting, power, earthing and bonding, CCTV, drainage, lifts and escalators, ventilation, security and passenger information systems.<\/p>\n<p>Ultimately, the rigorous testing and commissioning regime will allow passenger services to run safely through the tunnels to the new underground stations at Roma Street, Albert Street in the middle of the CBD, Woolloongabba and Boggo Road.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/train-travels-through-cross-river-rail-tunnels\/\">Train travels through Cross River Rail tunnels<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Cross-River-Rail-First-Train-Roma-Street-01-1.jpg\" alt=\"\"><figcaption>Image\/Cross River Rail<\/figcaption><\/figure>\n<p>In a milestone for the Cross River Rail project, a train has entered one of the project\u2019s twin tunnels and \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/train-travels-through-cross-river-rail-tunnels\/\">Train travels through Cross River Rail tunnels<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,4353,163],"tags":[10376],"class_list":["post-142128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-major-projects-infrastructure","category-rail-industry-news-australia-new-zealand","tag-rail-express"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/142128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=142128"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/142128\/revisions"}],"predecessor-version":[{"id":142129,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/142128\/revisions\/142129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=142128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=142128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=142128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}