{"id":138429,"date":"2024-10-10T07:34:07","date_gmt":"2024-10-09T21:34:07","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117629"},"modified":"2024-10-10T07:34:07","modified_gmt":"2024-10-09T21:34:07","slug":"extensive-works-completed-over-four-day-shutdown","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=138429","title":{"rendered":"Extensive works completed over four-day shutdown"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/20241009-News-Header-Image-Arc-completes-extensive-works-over-four-day-shutdown.png\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Arc Infrastructure<\/figcaption><\/figure>\n<p><strong><a href=\"https:\/\/www.arcinfra.com\/\">Arc Infrastructure<\/a> has successfully completed a range of critical upgrade works on the <a href=\"https:\/\/www.railexpress.com.au\/rail-industry-news-australia-new-zealand\/state-based-news\/western-australia\/\">Western Australia<\/a>\u2019s freight rail network, timed within an 86-hour shutdown last week. <\/strong><span id=\"more-117629\"><\/span><\/p>\n<p>Arc\u2019s Major Projects, Mobile Maintenance, Third Party Projects, Planning and Contract Services, Regional Teams from Metro, Central, Goldfields and the Rail Recovery Team utilised the four-day shutdown to complete works on several rail lines within the Arc network, in one of the most extensive simultaneous works programs the business has ever undertaken.<\/p>\n<p>A variety of critical upgrades were completed between 1 \u2013 4 October, including:<\/p>\n<ul>\n<li>Three dual-gauge turnout replacements at Moondyne, Avon Valley \u2013 Avon-Midland line.<\/li>\n<li>Installation of the first High Level Platform, Merredin \u2013 Eastern Goldfields Railway (EGR).<\/li>\n<li>Three culvert replacements, from Bungulla to Hines Hill\u00a0 \u2013 EGR.<\/li>\n<li>Support for the demolition of the old Walgoolan Road bridge, Carrabin \u2013 EGR.<\/li>\n<li>Beaton Road Level Crossing upgrades, Southern Cross \u2013 EGR.<\/li>\n<li>Supporting the Midland Station Redevelopment project, including removal and replacement of two end of life turnouts and commissioning of new signalling infrastructure &#8211; Midland.<\/li>\n<li>Various other track upgrades, including a turnout replacement at Carrabin, Jaurdi Crossing Loop upgrade and multiple rerailing sites across three regions.<\/li>\n<\/ul>\n<p>In Midland alone the team required 550 metres of track and 2000 tonnes of ballast to complete the required works.<\/p>\n<p>Of the three culverts on the EGR, one required the placement of 36 culvert boxes using two 90 tonne cranes to create nine openings. A culvert is structure that channels water past an obstacle. A culvert box is precast concrete structure that is shaped like a rectangle or a square.<\/p>\n<p>The upgrades were carefully coordinated to minimise disruption to customers while maximising the volume of work that could be completed during the planned shutdown.<\/p>\n<p>Chief Executive Officer Murray Cook acknowledged the significant effort that went into planning and delivering the works.<\/p>\n<p>\u201cThe careful planning and coordination required to complete such a volume of work safely in a short timeframe and to such a high standard is a credit to our people and all the contractors supporting these works,&#8221; he said.<\/p>\n<p>&#8220;To support these works Arc utilised additional resources, including equipment hire and labour from more than 10 separate contractor and supply companies.<\/p>\n<p>\u201cThe successful completion of the planned works is a credit to those involved, especially considering the challenging weather conditions faced during the shut, including high winds, rain and lightning.<\/p>\n<p>\u201cI\u2019m proud that we have been able to safely execute these upgrade works, which enable the continued safe and efficient operation of the State\u2019s freight rail network.<\/p>\n<p>\u201cMaintenance activities and upgrades mean the network we manage continues to reliably connect local businesses, communities and industries with eastern states and overseas markets.&#8221;<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/extensive-works-completed-over-four-day-shutdown\/\">Extensive works completed over four-day shutdown<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/20241009-News-Header-Image-Arc-completes-extensive-works-over-four-day-shutdown.png\" alt=\"\"><figcaption>Image\/Arc Infrastructure<\/figcaption><\/figure>\n<p>Arc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/extensive-works-completed-over-four-day-shutdown\/\">Extensive works completed over four-day shutdown<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[10519,10520,166,163,906],"tags":[10376,4553],"class_list":["post-138429","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maintenance-and-repairs","category-operations-maintenance","category-operations-and-maintenance","category-rail-industry-news-australia-new-zealand","category-state","tag-rail-express","tag-western-australia"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=138429\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Extensive works completed over four-day shutdown - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=138429\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-09T21:34:07+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-09T21:34:07+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Extensive works completed over four-day shutdown - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#blogposting\",\"name\":\"Extensive works completed over four-day shutdown - VibeWire Magazine\",\"headline\":\"Extensive works completed over four-day shutdown\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-10-10T07:34:07+10:00\",\"dateModified\":\"2024-10-10T07:34:07+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#webpage\"},\"articleSection\":\"Maintenance and Repairs, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), State, Rail Express, Western Australia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#listItem\",\"name\":\"Extensive works completed over four-day shutdown\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#listItem\",\"position\":3,\"name\":\"Extensive works completed over four-day shutdown\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429\",\"name\":\"Extensive works completed over four-day shutdown - VibeWire Magazine\",\"description\":\"Image\\\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\\u2019s freight rail network, timed within \\u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=138429#mainImage\"},\"datePublished\":\"2024-10-10T07:34:07+10:00\",\"dateModified\":\"2024-10-10T07:34:07+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Extensive works completed over four-day shutdown - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Extensive works completed over four-day shutdown - VibeWire Magazine","description":"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=138429","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=138429#blogposting","name":"Extensive works completed over four-day shutdown - VibeWire Magazine","headline":"Extensive works completed over four-day shutdown","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-10-10T07:34:07+10:00","dateModified":"2024-10-10T07:34:07+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=138429#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=138429#webpage"},"articleSection":"Maintenance and Repairs, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), State, Rail Express, Western Australia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=138429#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=138429#listItem","name":"Extensive works completed over four-day shutdown"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=138429#listItem","position":3,"name":"Extensive works completed over four-day shutdown","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=138429\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=138429\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=138429#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=138429#webpage","url":"https:\/\/www.vibewire.com.au\/?p=138429","name":"Extensive works completed over four-day shutdown - VibeWire Magazine","description":"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=138429#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=138429\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=138429#mainImage"},"datePublished":"2024-10-10T07:34:07+10:00","dateModified":"2024-10-10T07:34:07+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Extensive works completed over four-day shutdown - VibeWire Magazine","og:description":"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=138429","article:published_time":"2024-10-09T21:34:07+00:00","article:modified_time":"2024-10-09T21:34:07+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Extensive works completed over four-day shutdown - VibeWire Magazine","twitter:description":"Image\/Arc InfrastructureArc Infrastructure has successfully completed a range of critical upgrade works on the Western Australia\u2019s freight rail network, timed within \u2026 The post Extensive works completed over four-day shutdown appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"138429","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-30 02:55:44","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-30 02:55:44","updated":"2025-08-30 02:55:44"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tExtensive works completed over four-day shutdown\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Extensive works completed over four-day shutdown","link":"https:\/\/www.vibewire.com.au\/?p=138429"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/138429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=138429"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/138429\/revisions"}],"predecessor-version":[{"id":138464,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/138429\/revisions\/138464"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=138429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=138429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=138429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}