{"id":13801,"date":"2024-02-22T03:56:17","date_gmt":"2024-02-21T17:56:17","guid":{"rendered":"https:\/\/www.rtands.com\/?p=52594"},"modified":"2024-02-22T03:56:17","modified_gmt":"2024-02-21T17:56:17","slug":"io-and-metrolinx-award-255m-contract-for-eglinton-crosstown-west-extension-design-build","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=13801","title":{"rendered":"IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design &amp; Build"},"content":{"rendered":"<p>ONTARIO \u2013 STRABAG Inc. was awarded the $255 million contract to for the second underground segment of the extension.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/passenger\/io-and-metrolinx-award-255m-contract-for-eglinton-crosstown-west-extension-design-build\/\">IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design &amp; Build<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ONTARIO \u2013 STRABAG Inc. was awarded the $255 million contract to for the second underground segment of the extension.<br \/>\nThe post IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design &amp; Build appeared first on Railway Track&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,29,30,57,4836,523,49,51,372,4837,58,4821,33,4838],"tags":[],"class_list":["post-13801","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-bridge-retaining-walls-tunnels","category-bridges-tunnels","category-commuter-regional","category-infrastructure-ohio","category-metrolinx","category-passenger","category-passenger-rail","category-rapid-transit-light-rail","category-strabag-inc","category-track-construction","category-track-machinery","category-track-structure","category-tunnel-boring-machine-tbm"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/13801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13801"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/13801\/revisions"}],"predecessor-version":[{"id":13802,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/13801\/revisions\/13802"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}