{"id":136469,"date":"2024-10-04T09:09:26","date_gmt":"2024-10-03T23:09:26","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117590"},"modified":"2024-10-04T09:09:26","modified_gmt":"2024-10-03T23:09:26","slug":"gap-bridge-replacement-project-completed-at-werris-creek","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=136469","title":{"rendered":"Gap Bridge Replacement project completed at Werris Creek"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Day-5-ARTC-Werris-Creek-2024-Large-22.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/ARTC<\/figcaption><\/figure>\n<article id=\"post-22521\" class=\"post-22521 post type-post status-publish format-standard has-post-thumbnail hentry category-media\">\n<div class=\"entry-content\">\n<p><strong>The Australian Rail Track Corporation (<a href=\"https:\/\/www.artc.com.au\/\">ARTC<\/a>) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool Plains region.<\/strong><\/p>\n<p><span id=\"more-117590\"><\/span>The project, delivered in partnership with contractor John Holland, has replaced the life-expired steel rail bridge at Werris Creek and delivered a new concrete ballast top structure, improving the safety and reliability of the bridge for future operations.<\/p>\n<p>In just four days during a scheduled 96-hour track closedown in early August 2024, ARTC and John Holland teams efficiently removed the existing bridge and installed a new 5-span 80-metre-long concrete bridge, which included the construction of 160m of new track.<\/p>\n<p>The new bridge is now fully operational and designed to meet modern safety standards and support increased rail traffic, contributing to the overall efficiency and reliability of the rail network in the <a href=\"https:\/\/www.railexpress.com.au\/rail-industry-news-australia-new-zealand\/state-based-news\/nsw\/\">Hunter Valley<\/a>.<\/p>\n<p>Clinton Crump, Group Executive Operations, ARTC said the Hunter Valley region serves as a vital corridor for transporting goods, connecting various industries and communities.<\/p>\n<p>&#8220;We are pleased to have delivered the Gap Bridge Replacement Project, which will contribute to the overall reliability of the rail network in the Hunter Valley, a critical rail corridor in our network,&#8221; he said.<\/p>\n<p>The ARTC and John Holland teams extend their gratitude to the local community and stakeholders for their support and patience throughout the project, particularly with the extended closure of Gap Road.\u201d<\/p>\n<p>Wet weather impacted the project with heavy rain and significant flooding causing erosion on Gap Road and delaying its reopening.<\/p>\n<p>ARTC worked with Liverpool Plains Shire Council to have the road repaired as quickly as possible.<\/p>\n<p>This project reflects ARTC\u2019s commitment to continuous improvement and investment in vital infrastructure, facilitating smoother and more reliable rail operations, benefiting both freight and passenger services in the region.<\/p>\n<\/div>\n<\/article>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/gap-bridge-replacement-project-completed-at-werris-creek\/\">Gap Bridge Replacement project completed at Werris Creek<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Day-5-ARTC-Werris-Creek-2024-Large-22.jpg\" alt=\"\"><figcaption>Image\/ARTC<\/figcaption><\/figure>\n<p>The Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/gap-bridge-replacement-project-completed-at-werris-creek\/\">Gap Bridge Replacement project completed at Werris Creek<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,4353,163],"tags":[10376],"class_list":["post-136469","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-major-projects-infrastructure","category-rail-industry-news-australia-new-zealand","tag-rail-express"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=136469\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=136469\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-03T23:09:26+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-03T23:09:26+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#blogposting\",\"name\":\"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine\",\"headline\":\"Gap Bridge Replacement project completed at Werris Creek\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-10-04T09:09:26+10:00\",\"dateModified\":\"2024-10-04T09:09:26+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#webpage\"},\"articleSection\":\"Industry Infrastructure, Major Projects &amp; Infrastructure, Rail industry news (Australia, New Zealand), Rail Express\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#listItem\",\"name\":\"Gap Bridge Replacement project completed at Werris Creek\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#listItem\",\"position\":3,\"name\":\"Gap Bridge Replacement project completed at Werris Creek\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469\",\"name\":\"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine\",\"description\":\"Image\\\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \\u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=136469#mainImage\"},\"datePublished\":\"2024-10-04T09:09:26+10:00\",\"dateModified\":\"2024-10-04T09:09:26+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine","description":"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=136469","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=136469#blogposting","name":"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine","headline":"Gap Bridge Replacement project completed at Werris Creek","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-10-04T09:09:26+10:00","dateModified":"2024-10-04T09:09:26+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=136469#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=136469#webpage"},"articleSection":"Industry Infrastructure, Major Projects &amp; Infrastructure, Rail industry news (Australia, New Zealand), Rail Express"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=136469#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=136469#listItem","name":"Gap Bridge Replacement project completed at Werris Creek"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=136469#listItem","position":3,"name":"Gap Bridge Replacement project completed at Werris Creek","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=136469\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=136469\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=136469#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=136469#webpage","url":"https:\/\/www.vibewire.com.au\/?p=136469","name":"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine","description":"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=136469#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=136469\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=136469#mainImage"},"datePublished":"2024-10-04T09:09:26+10:00","dateModified":"2024-10-04T09:09:26+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine","og:description":"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=136469","article:published_time":"2024-10-03T23:09:26+00:00","article:modified_time":"2024-10-03T23:09:26+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Gap Bridge Replacement project completed at Werris Creek - VibeWire Magazine","twitter:description":"Image\/ARTCThe Australian Rail Track Corporation (ARTC) has announced the successful completion of the Gap Bridge Replacement project in the Liverpool \u2026 The post Gap Bridge Replacement project completed at Werris Creek appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"136469","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-30 00:11:30","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-30 00:11:30","updated":"2025-08-30 00:11:30"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tGap Bridge Replacement project completed at Werris Creek\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Gap Bridge Replacement project completed at Werris Creek","link":"https:\/\/www.vibewire.com.au\/?p=136469"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/136469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=136469"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/136469\/revisions"}],"predecessor-version":[{"id":136472,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/136469\/revisions\/136472"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=136469"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=136469"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=136469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}