{"id":135722,"date":"2024-10-02T14:29:44","date_gmt":"2024-10-02T04:29:44","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117567"},"modified":"2024-10-02T14:29:44","modified_gmt":"2024-10-02T04:29:44","slug":"final-designs-released-for-melton-level-crossing-removals","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=135722","title":{"rendered":"Final designs released for Melton level crossing removals"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-1.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p class=\"text-align-justify\"><strong><span lang=\"EN-US\">The Victorian Government has released the <a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/melton\">final designs<\/a> of the new Melton Station and four level crossing removals on the Melton Line \u2013 which will soon transform the way people travel in Melbourne\u2019s booming west.<\/span><\/strong><span id=\"more-117567\"><\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Minister for Transport Infrastructure Danny Pearson announced a new rail bridge will be built to ensure traffic is no longer stuck at the level crossings on Coburns and Exford roads.\u00a0<\/span><\/p>\n<p><span lang=\"EN-US\">\u201cWe\u2019re getting rid of these four dangerous and congested level crossings to make Melton boom gate free \u2013 which will cut congestion in Melbourne\u2019s booming west,\u201d he said.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">New road bridges with dedicated shared use paths will also be delivered along Ferris Road in Melton and Hopkins Road in Truginina \u2013 making journeys safer for pedestrians and cyclists.<\/span><\/p>\n<figure id=\"attachment_117570\" aria-describedby=\"caption-attachment-117570\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-117570\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2-300x169.jpg 300w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2-1024x576.jpg 1024w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2-768x432.jpg 768w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-2.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-117570\" class=\"wp-caption-text\">Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">The new Melton Station will be built with four platforms to cater for one of the fastest growing communities in Australia \u2013 paving the way for more services and boosting capacity on the line.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">The station can be accessed from both sides of the rail line and each platform will be accessible from lifts and stairs.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">The elevated station will also include pick up and drop off zones, a new air-conditioned waiting room and staffed ticket office, along with lighting and security cameras installed throughout the precinct.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">More than 850 submissions from locals helped shape the final designs, with the community wanting to improve passenger facilities and safety at the new Melton Station \u2013 along with planting a wide range of native and indigenous plants, trees and grasses.\u00a0<\/span><\/p>\n<figure id=\"attachment_117571\" aria-describedby=\"caption-attachment-117571\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-117571\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3-300x169.jpg 300w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3-1024x576.jpg 1024w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3-768x432.jpg 768w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-3.jpg 1200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-117571\" class=\"wp-caption-text\">Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p class=\"text-align-justify\"><span lang=\"EN-US\"><a href=\"https:\/\/www.railexpress.com.au\/contract-awarded-for-level-crossing-removals-in-melton\/\">The new<\/a> Melton Station will open and the four dangerous and congested level crossings will be gone for good in 2026 \u2013 two years ahead of schedule \u2013 with construction set to begin later this year.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">In a separate package of works, planning is progressing on the Labor Government\u2019s $650 million Melton Line Upgrade, which will allow nine-car VLocity trains to travel on the line, reducing crowding and increasing passenger capacity by 50 per cent.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">The Level Crossing Removal Project is removing 110 level crossings by 2030, with the Lilydale, Sunbury, Pakenham, Cranbourne, Frankston and Werribee lines to be boom-gate free \u2013 changing the way people live, work and travel.<\/span><\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/final-designs-released-for-melton-level-crossing-removals\/\">Final designs released for Melton level crossing removals<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/10\/Melton-1.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>The Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/final-designs-released-for-melton-level-crossing-removals\/\">Final designs released for Melton level crossing removals<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163,10574,164],"tags":[10376,8],"class_list":["post-135722","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-station-design","category-train-stations","tag-rail-express","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Victoria&#039;s Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=135722\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Final designs released for Melton level crossing removals - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Victoria&#039;s Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=135722\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-10-02T04:29:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-10-02T04:29:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Final designs released for Melton level crossing removals - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Victoria&#039;s Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#blogposting\",\"name\":\"Final designs released for Melton level crossing removals - VibeWire Magazine\",\"headline\":\"Final designs released for Melton level crossing removals\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-10-02T14:29:44+10:00\",\"dateModified\":\"2024-10-02T14:29:44+10:00\",\"inLanguage\":\"en-AU\",\"commentCount\":2,\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#webpage\"},\"articleSection\":\"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Station Design, Train Stations, Rail Express, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#listItem\",\"name\":\"Final designs released for Melton level crossing removals\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#listItem\",\"position\":3,\"name\":\"Final designs released for Melton level crossing removals\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722\",\"name\":\"Final designs released for Melton level crossing removals - VibeWire Magazine\",\"description\":\"Image\\\/Victoria's Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \\u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=135722#mainImage\"},\"datePublished\":\"2024-10-02T14:29:44+10:00\",\"dateModified\":\"2024-10-02T14:29:44+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Final designs released for Melton level crossing removals - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Final designs released for Melton level crossing removals - VibeWire Magazine","description":"Image\/Victoria's Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=135722","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=135722#blogposting","name":"Final designs released for Melton level crossing removals - VibeWire Magazine","headline":"Final designs released for Melton level crossing removals","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-10-02T14:29:44+10:00","dateModified":"2024-10-02T14:29:44+10:00","inLanguage":"en-AU","commentCount":2,"mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=135722#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=135722#webpage"},"articleSection":"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Station Design, Train Stations, Rail Express, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=135722#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=135722#listItem","name":"Final designs released for Melton level crossing removals"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=135722#listItem","position":3,"name":"Final designs released for Melton level crossing removals","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=135722\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=135722\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=135722#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=135722#webpage","url":"https:\/\/www.vibewire.com.au\/?p=135722","name":"Final designs released for Melton level crossing removals - VibeWire Magazine","description":"Image\/Victoria's Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=135722#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=135722\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=135722#mainImage"},"datePublished":"2024-10-02T14:29:44+10:00","dateModified":"2024-10-02T14:29:44+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Final designs released for Melton level crossing removals - VibeWire Magazine","og:description":"Image\/Victoria's Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=135722","article:published_time":"2024-10-02T04:29:44+00:00","article:modified_time":"2024-10-02T04:29:44+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Final designs released for Melton level crossing removals - VibeWire Magazine","twitter:description":"Image\/Victoria's Big BuildThe Victorian Government has released the final designs of the new Melton Station and four level crossing removals on the \u2026 The post Final designs released for Melton level crossing removals appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"135722","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-29 23:07:01","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-29 23:07:01","updated":"2025-08-29 23:07:01"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tFinal designs released for Melton level crossing removals\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Final designs released for Melton level crossing removals","link":"https:\/\/www.vibewire.com.au\/?p=135722"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/135722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=135722"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/135722\/revisions"}],"predecessor-version":[{"id":136037,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/135722\/revisions\/136037"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=135722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=135722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=135722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}