{"id":130377,"date":"2024-09-20T08:46:07","date_gmt":"2024-09-19T22:46:07","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117461"},"modified":"2024-09-20T08:46:07","modified_gmt":"2024-09-19T22:46:07","slug":"inland-rail-installs-superstructure","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=130377","title":{"rendered":"Inland Rail installs superstructure"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/09\/WAN-Green-Street-Superstructure-lift_almost-in_20240914_108-SC-EC.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Inland Rail<\/figcaption><\/figure>\n<p><strong>Trains have returned to the Albury line following the completion of the successful <a href=\"https:\/\/inlandrail.com.au\/\">Inland Rail<\/a> 60-hour track possession that saw the completion of a large volume of rail and construction work between Wallan and Wangaratta.<\/strong><span id=\"more-117461\"><\/span><\/p>\n<div class=\"flex flex-wrap justify-between align-center\">\n<p>In a major milestone for the project, the pre-assembled Green St bridge superstructure was lifted into place in Wangaratta. On Saturday morning, over 150 local residents watched on as the structure was successfully installed over the railway line by a 650 tonne crawler crane.<\/p>\n<p>The structure is made up of two 50-tonne main girders, fifteen 3-tonne cross girders and 50 concrete transfloor sections.<\/p>\n<p>Ed Walker, Inland Rail Delivery Director Beveridge to Albury said it was a great team effort to plan for and complete such a large volume of work across so many sites.<\/p>\n<p>\u201cInland Rail and our construction partners McConnell Dowell and John Holland had crews in the region carrying out the work,&#8221; he said.<\/p>\n<p>\u201cInstalling the Green St bridge structure is a great milestone for the project and it\u2019s now on track to be opened before the end of the year.<\/p>\n<p>\u201cWe thank the community for their patience and understanding as we push ahead with this important project.\u201d<\/p>\n<p>Work at the Wangaratta railway station continued, including ongoing construction of the pedestrian underpass stairs, ramps and lift shafts; upgrading electrical services; ongoing construction of the new western platform and canopy; drainage works, and carrying out fire hydrant works and testing.<\/p>\n<p>Further work was undertaken along the Albury line, including site investigations and survey work in Benalla; slewing tracks in Seymour and Wallan; installing a signal gantry at Tallarook; and inspecting bridge sites in Broadford and the Hume Freeway (Seymour and Tallarook).<\/p>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/inland-rail-installs-superstructure\/\">Inland Rail installs superstructure<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/09\/WAN-Green-Street-Superstructure-lift_almost-in_20240914_108-SC-EC.jpg\" alt=\"\"><figcaption>Image\/Inland Rail<\/figcaption><\/figure>\n<p>Trains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/inland-rail-installs-superstructure\/\">Inland Rail installs superstructure<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[170,165,1614,326,10519,4353,10520,166,163],"tags":[10376],"class_list":["post-130377","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-rail","category-industry-infrastructure","category-infrastructure-projects","category-inland-rail","category-maintenance-and-repairs","category-major-projects-infrastructure","category-operations-maintenance","category-operations-and-maintenance","category-rail-industry-news-australia-new-zealand","tag-rail-express"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=130377\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Inland Rail installs superstructure - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=130377\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-09-19T22:46:07+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-09-19T22:46:07+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Inland Rail installs superstructure - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#blogposting\",\"name\":\"Inland Rail installs superstructure - VibeWire Magazine\",\"headline\":\"Inland Rail installs superstructure\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-09-20T08:46:07+10:00\",\"dateModified\":\"2024-09-20T08:46:07+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#webpage\"},\"articleSection\":\"Freight Rail, Industry Infrastructure, Infrastructure Projects, Inland Rail, Maintenance and Repairs, Major Projects &amp; Infrastructure, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), Rail Express\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#listItem\",\"name\":\"Inland Rail installs superstructure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#listItem\",\"position\":3,\"name\":\"Inland Rail installs superstructure\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377\",\"name\":\"Inland Rail installs superstructure - VibeWire Magazine\",\"description\":\"Image\\\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \\u2026 The post Inland Rail installs superstructure appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=130377#mainImage\"},\"datePublished\":\"2024-09-20T08:46:07+10:00\",\"dateModified\":\"2024-09-20T08:46:07+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Inland Rail installs superstructure - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Inland Rail installs superstructure - VibeWire Magazine","description":"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=130377","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=130377#blogposting","name":"Inland Rail installs superstructure - VibeWire Magazine","headline":"Inland Rail installs superstructure","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-09-20T08:46:07+10:00","dateModified":"2024-09-20T08:46:07+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=130377#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=130377#webpage"},"articleSection":"Freight Rail, Industry Infrastructure, Infrastructure Projects, Inland Rail, Maintenance and Repairs, Major Projects &amp; Infrastructure, Operations &amp; Maintenance, Operations and Maintenance, Rail industry news (Australia, New Zealand), Rail Express"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=130377#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=130377#listItem","name":"Inland Rail installs superstructure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=130377#listItem","position":3,"name":"Inland Rail installs superstructure","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=130377\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=130377\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=130377#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=130377#webpage","url":"https:\/\/www.vibewire.com.au\/?p=130377","name":"Inland Rail installs superstructure - VibeWire Magazine","description":"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=130377#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=130377\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=130377#mainImage"},"datePublished":"2024-09-20T08:46:07+10:00","dateModified":"2024-09-20T08:46:07+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Inland Rail installs superstructure - VibeWire Magazine","og:description":"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=130377","article:published_time":"2024-09-19T22:46:07+00:00","article:modified_time":"2024-09-19T22:46:07+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Inland Rail installs superstructure - VibeWire Magazine","twitter:description":"Image\/Inland RailTrains have returned to the Albury line following the completion of the successful Inland Rail 60-hour track possession that saw \u2026 The post Inland Rail installs superstructure appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"130377","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-29 17:44:14","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-29 17:44:14","updated":"2025-08-29 17:44:14"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tInland Rail installs superstructure\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Inland Rail installs superstructure","link":"https:\/\/www.vibewire.com.au\/?p=130377"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/130377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=130377"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/130377\/revisions"}],"predecessor-version":[{"id":130381,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/130377\/revisions\/130381"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=130377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=130377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=130377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}