{"id":12661,"date":"2024-02-20T05:44:00","date_gmt":"2024-02-19T19:44:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=cc73d1960d9b82137881e7f61be95372"},"modified":"2024-02-20T05:44:00","modified_gmt":"2024-02-19T19:44:00","slug":"train-services-disrupted-for-last-phase-of-devon-and-cornwall-signal-upgrade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=12661","title":{"rendered":"Train services disrupted for last phase of Devon and Cornwall signal upgrade"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"1170\" height=\"658\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/02\/GWR-train-at-Truro-station-with-level-crossing-that-will-be-upgraded-.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"GWR train at Truro station with level crossing that will be upgraded\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" \/>A week tomorrow (Tuesday 27 February), Network Rail will begin the final phase of signalling modernisation in Cornwall.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A week tomorrow (Tuesday 27 February), Network Rail will begin the final phase of signalling modernisation in Cornwall.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2746,2747,2557,3246,3229,4681,343,2424,4682,4683,4684,113,3230,4685,4686,2327,2537,3234,4687,4688,3235],"tags":[],"class_list":["post-12661","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cornwall","category-devon","category-exeter","category-exeter-st-davids","category-falmouth","category-falmouth-docks","category-infrastructure","category-level-crossing","category-liskeard","category-looe","category-lostwithiel","category-network-rail","category-newquay","category-penzance","category-plymouth","category-siemens","category-signalling","category-st-austell","category-st-erth","category-totnes","category-truro"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/12661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12661"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/12661\/revisions"}],"predecessor-version":[{"id":13442,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/12661\/revisions\/13442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}