{"id":122719,"date":"2024-09-08T11:31:13","date_gmt":"2024-09-08T01:31:13","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=122719"},"modified":"2024-09-08T11:31:17","modified_gmt":"2024-09-08T01:31:17","slug":"work-begins-to-restore-tram-services-in-domain-road-and-park-street","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=122719","title":{"rendered":"Work begins to restore tram services in Domain Road and Park Street"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Just prior to the commencement of works on building the Anzac Railway Station (that has taken far longer than necessary) changes were made to the tram network in the area.  The tracks on St Kilda Road were slewed to provide access to the site on the corner of Domain and St Kilda Roads.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A further change was made being the routing of Toorak Road trams, <a href=\"https:\/\/yarratrams.com.au\/route-guides\/route-58\" target=\"_blank\" rel=\"noopener\" title=\"\">Route 58<\/a>, from Domain Road and Park Street to new track on Toorak Road connecting with the existing track at Park Street.  This cost must have been huge and removed trams from Park Street and Domain Road for years despite complaints from the public.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction snapshot for September 2024<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction works within the Domain precinct during September will include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reinstatement works on Domain Road and construction of a new tram and bus stop<\/li>\n\n\n\n<li>Edmund Herring Oval reinstatement works<\/li>\n\n\n\n<li>Station entrance construction<\/li>\n\n\n\n<li>Asphalting, median works and construction of footpaths<\/li>\n\n\n\n<li>Finishing paving and landscaping around the South African Soldiers\u2019 Memorial.<\/li>\n<\/ul>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_-768x1024.jpeg\" alt=\"\" class=\"wp-image-122720\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_-768x1024.jpeg 768w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_-225x300.jpeg 225w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_-1152x1536.jpeg 1152w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">This photo from <a href=\"https:\/\/x.com\/hamhammer27\" target=\"_blank\" rel=\"noopener\" title=\"\">HAM on twitter<\/a> shows works being conducted on a new tram stop platform in Domain Road.  Good news for residents and those wanting better access to the Botanical Gardens.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Also clear in the photo the new stop will prevent vehicle access in Domain Road.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.<\/p>\n","protected":false},"author":21,"featured_media":122720,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[190,1168,47,8437],"tags":[13194,13193],"class_list":["post-122719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-light-rail","category-metro-tunnel","category-rail-news","category-yarra-trams","tag-domain-road","tag-route-58"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bardy Bigglesworth\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=122719\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Work begins to restore tram services in Domain Road and Park Street\" \/>\n\t\t<meta property=\"og:description\" content=\"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=122719\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t\t<meta property=\"og:image:height\" content=\"2048\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-09-08T01:31:13+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-09-08T01:31:17+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Work begins to restore tram services in Domain Road and Park Street\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#blogposting\",\"name\":\"Work begins to restore tram services in Domain Road and Park Street\",\"headline\":\"Work begins to restore tram services in Domain Road and Park Street\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/GW2WcE9aQAAFRL_.jpeg\",\"width\":1536,\"height\":2048},\"datePublished\":\"2024-09-08T11:31:13+10:00\",\"dateModified\":\"2024-09-08T11:31:17+10:00\",\"inLanguage\":\"en-AU\",\"commentCount\":1,\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#webpage\"},\"articleSection\":\"Light Rail, Metro Tunnel, Rail News, Yarra Trams, Domain Road, Route 58\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#listItem\",\"name\":\"Work begins to restore tram services in Domain Road and Park Street\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#listItem\",\"position\":3,\"name\":\"Work begins to restore tram services in Domain Road and Park Street\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21\",\"name\":\"Bardy Bigglesworth\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bardy Bigglesworth\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719\",\"name\":\"Work begins to restore tram services in Domain Road and Park Street\",\"description\":\"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/GW2WcE9aQAAFRL_.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719\\\/#mainImage\",\"width\":1536,\"height\":2048},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=122719#mainImage\"},\"datePublished\":\"2024-09-08T11:31:13+10:00\",\"dateModified\":\"2024-09-08T11:31:17+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Work begins to restore tram services in Domain Road and Park Street<\/title>\n\n","aioseo_head_json":{"title":"Work begins to restore tram services in Domain Road and Park Street","description":"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=122719","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=122719#blogposting","name":"Work begins to restore tram services in Domain Road and Park Street","headline":"Work begins to restore tram services in Domain Road and Park Street","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg","width":1536,"height":2048},"datePublished":"2024-09-08T11:31:13+10:00","dateModified":"2024-09-08T11:31:17+10:00","inLanguage":"en-AU","commentCount":1,"mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=122719#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=122719#webpage"},"articleSection":"Light Rail, Metro Tunnel, Rail News, Yarra Trams, Domain Road, Route 58"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=122719#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=122719#listItem","name":"Work begins to restore tram services in Domain Road and Park Street"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=122719#listItem","position":3,"name":"Work begins to restore tram services in Domain Road and Park Street","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=122719\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=122719\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=21#author","url":"https:\/\/www.vibewire.com.au\/?author=21","name":"Bardy Bigglesworth","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=122719#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bardy Bigglesworth"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=122719#webpage","url":"https:\/\/www.vibewire.com.au\/?p=122719","name":"Work begins to restore tram services in Domain Road and Park Street","description":"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=122719#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=122719\/#mainImage","width":1536,"height":2048},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=122719#mainImage"},"datePublished":"2024-09-08T11:31:13+10:00","dateModified":"2024-09-08T11:31:17+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Work begins to restore tram services in Domain Road and Park Street","og:description":"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.","og:url":"https:\/\/www.vibewire.com.au\/?p=122719","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg","og:image:width":"1536","og:image:height":"2048","article:published_time":"2024-09-08T01:31:13+00:00","article:modified_time":"2024-09-08T01:31:17+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Work begins to restore tram services in Domain Road and Park Street","twitter:description":"Despite the changes the tracks in Park Street and Domain Road together with the tram overhead wiring remained in place for reactivation.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg"},"aioseo_meta_data":{"post_id":"122719","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/09\/GW2WcE9aQAAFRL_.jpeg","og_image_width":"1536","og_image_height":"2048","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2025-08-29 02:40:45","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-09-08 01:24:39","updated":"2025-08-29 02:40:45"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tWork begins to restore tram services in Domain Road and Park Street\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Work begins to restore tram services in Domain Road and Park Street","link":"https:\/\/www.vibewire.com.au\/?p=122719"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/122719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=122719"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/122719\/revisions"}],"predecessor-version":[{"id":122726,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/122719\/revisions\/122726"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/122720"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=122719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=122719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=122719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}