{"id":120189,"date":"2024-09-04T09:02:50","date_gmt":"2024-09-03T23:02:50","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117301"},"modified":"2024-09-04T09:02:50","modified_gmt":"2024-09-03T23:02:50","slug":"last-piece-of-the-puzzle-installed-at-calder-park-drive","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=120189","title":{"rendered":"Last piece of the puzzle installed at Calder Park Drive"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/09\/breakout83_xl.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p><strong>The\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/calder-park-drive-calder-park\"  rel=\"noopener\">Calder Park Drive, Calder Park<\/a>\u00a0level crossing removal project has achieved another major milestone, with the last concrete panel for the road bridge wall lifted into place.<\/strong><span id=\"more-117301\"><\/span><\/p>\n<p>Crews have been installing the giant panels piece by piece since February, as well as 2304 steel reinforcement straps to hold the panels in place.<\/p>\n<p>The design of the 264 concrete panels \u2013 some measuring up to 8.5m \u2013 was inspired by the nearby Organ Pipes rock facade.<\/p>\n<p>The reinforced retaining walls support new road bridge infrastructure and allow for beams to be lifted into place in the next stage of construction.<\/p>\n<p>Over the past few months, crews have also been working on building the foundations of the road bridge and completing ground improvement works.<\/p>\n<p>Getting rid of the level crossing at Calder Park Drive will make journeys faster and local roads safer.<\/p>\n<p>The Calder Park Drive Level Crossing will be gone for good in 2025 and bring the Sunbury Line one step closer to being level crossing free in 2025.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/last-piece-of-the-puzzle-installed-at-calder-park-drive\/\">Last piece of the puzzle installed at Calder Park Drive<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/09\/breakout83_xl.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>The\u00a0Calder Park Drive, Calder Park\u00a0level crossing removal project has achieved another major milestone, with the last concrete panel for the \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/last-piece-of-the-puzzle-installed-at-calder-park-drive\/\">Last piece of the puzzle installed at Calder Park Drive<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163],"tags":[10376,8],"class_list":["post-120189","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","tag-rail-express","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/120189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=120189"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/120189\/revisions"}],"predecessor-version":[{"id":120190,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/120189\/revisions\/120190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=120189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=120189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=120189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}