{"id":119996,"date":"2024-09-04T02:30:00","date_gmt":"2024-09-03T16:30:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=c3815a1ca0d5c84176d27774c18b03b1"},"modified":"2024-09-04T02:30:00","modified_gmt":"2024-09-03T16:30:00","slug":"hs2-milestone-reached-with-completion-of-first-viaduct","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=119996","title":{"rendered":"HS2 milestone reached with completion of first viaduct"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"640\" height=\"354\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"Constructing Highfurlong Brook Viaduct. \/\/ Credit: HS2\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" srcset=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1.jpg 1280w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1-300x166.jpg 300w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1-768x424.jpg 768w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1-750x414.jpg 750w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1-624x345.jpg 624w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/09\/Highfurlong-Brook-1-600x331.jpg 600w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>A milestone has been reached with the completion of the first of over 50 viaducts that are being constructed as part of the HS2 project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A milestone has been reached with the completion of the first of over 50 viaducts that are being constructed as part of the HS2 project.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[3264,1089,343,6121,5703,47],"tags":[12406],"class_list":["post-119996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bam-nuttall","category-hs2","category-infrastructure","category-kier","category-northamptonshire","category-rail-news","tag-rail-advent"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/119996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=119996"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/119996\/revisions"}],"predecessor-version":[{"id":120538,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/119996\/revisions\/120538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=119996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=119996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=119996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}