{"id":116977,"date":"2024-08-29T17:42:40","date_gmt":"2024-08-29T07:42:40","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=116977"},"modified":"2024-08-29T17:42:46","modified_gmt":"2024-08-29T07:42:46","slug":"winter-blitz-complete-level-crossings-gone-new-stations-open","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=116977","title":{"rendered":"Winter blitz complete, level crossings gone, new stations open"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Train services have returned to the Geelong Line following an intensive 72-day winter construction blitz to complete major construction on the\u00a0<a href=\"https:\/\/www.vibewire.com.au\/?p=116132\" target=\"_blank\" rel=\"noopener\" title=\"A trip to Waurn Ponds with new rail works at South Geelong\">South Geelong to Waurn Ponds Duplication.<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has delivered eight kilometres of duplicated track, upgrades to&nbsp;<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/geelong-line-upgrade\/projects\/marshall-station\">Marshall&nbsp;<\/a>and&nbsp;<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/geelong-line-upgrade\/projects\/south-geelong-station-upgrade\">South Geelong<\/a>&nbsp;stations and the removal of two dangerous level crossings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Trains are now travelling over new rail bridges at&nbsp;<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/geelong-line-upgrade\/projects\/fyans-street-level-crossing-removal\">Fyans Street<\/a>&nbsp;and&nbsp;<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/geelong-line-upgrade\/projects\/surf-coast-highway\">Surf Coast Highway<\/a>, with the removal of the two level crossings reducing congestion for more than 46,000 drivers that use these roads each day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The duplication of more than eight kilometres of track between South Geelong Station and Breakwater Road, and from Marshalltown Road to Waurn Ponds Station, will improve reliability for services \u2013 making it easier for trains to pass each other and reducing unexpected delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New station buildings are open at South Geelong and Marshall, with both featuring a second platform, accessible pedestrian overpasses, new car parking spaces and improved shelter and CCTV to improve safety for passengers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.vibewire.com.au\/?p=116729\" target=\"_blank\" rel=\"noopener\" title=\"Marshall Station upgrade\">Marshall Station<\/a> features a waiting room for the first time, with passengers to benefit from 270 new car parking spaces at the station and a dedicated bus loop.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Artwork by local artist James Price has been revealed in full on the station pedestrian overpass and ramps, and highlights the themes of local sport and community in his design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Crews will continue minor works at the stations including finishing the Yarra Street car park entrance and lifts at South Geelong Station, and the forecourt and lifts at Marshall Station, with work on landscaping and walking and cycling paths to continue in spring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Learn more about the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/geelong-line-upgrade\">Geelong Line Upgrade<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project has delivered eight kilometres of duplicated track, upgrades to\u00a0Marshall\u00a0and\u00a0South Geelong\u00a0stations.<\/p>\n","protected":false},"author":1,"featured_media":116172,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[10073,47,186],"tags":[4598,12978,10742,9948,8],"class_list":["post-116977","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-myki","category-rail-news","category-v-line","tag-geelong","tag-marshall-railway-station","tag-south-geelong","tag-south-geelong-to-waurn-ponds-duplication","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=116977\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Winter blitz complete, level crossings gone, new stations open\" \/>\n\t\t<meta property=\"og:description\" content=\"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=116977\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-08-29T07:42:40+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-08-29T07:42:46+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Winter blitz complete, level crossings gone, new stations open\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#blogposting\",\"name\":\"Winter blitz complete, level crossings gone, new stations open\",\"headline\":\"Winter blitz complete, level crossings gone, new stations open\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/IMG_8288-scaled.jpeg\",\"width\":2560,\"height\":1920},\"datePublished\":\"2024-08-29T17:42:40+10:00\",\"dateModified\":\"2024-08-29T17:42:46+10:00\",\"inLanguage\":\"en-AU\",\"commentCount\":1,\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#webpage\"},\"articleSection\":\"Myki, Rail News, V\\\/Line, Geelong, Marshall Railway Station, South Geelong, South Geelong to Waurn Ponds Duplication, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#listItem\",\"name\":\"Winter blitz complete, level crossings gone, new stations open\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#listItem\",\"position\":3,\"name\":\"Winter blitz complete, level crossings gone, new stations open\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=1#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=1\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1bc814a4885e3784cfa5c59dba10fb1d36be5f9d983eef6f0fce28b34d4cf0e6?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"admin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977\",\"name\":\"Winter blitz complete, level crossings gone, new stations open\",\"description\":\"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/IMG_8288-scaled.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977\\\/#mainImage\",\"width\":2560,\"height\":1920},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=116977#mainImage\"},\"datePublished\":\"2024-08-29T17:42:40+10:00\",\"dateModified\":\"2024-08-29T17:42:46+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Winter blitz complete, level crossings gone, new stations open<\/title>\n\n","aioseo_head_json":{"title":"Winter blitz complete, level crossings gone, new stations open","description":"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=116977","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=116977#blogposting","name":"Winter blitz complete, level crossings gone, new stations open","headline":"Winter blitz complete, level crossings gone, new stations open","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=1#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg","width":2560,"height":1920},"datePublished":"2024-08-29T17:42:40+10:00","dateModified":"2024-08-29T17:42:46+10:00","inLanguage":"en-AU","commentCount":1,"mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=116977#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=116977#webpage"},"articleSection":"Myki, Rail News, V\/Line, Geelong, Marshall Railway Station, South Geelong, South Geelong to Waurn Ponds Duplication, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=116977#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=116977#listItem","name":"Winter blitz complete, level crossings gone, new stations open"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=116977#listItem","position":3,"name":"Winter blitz complete, level crossings gone, new stations open","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=116977\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=116977\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=1#author","url":"https:\/\/www.vibewire.com.au\/?author=1","name":"admin","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=116977#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/1bc814a4885e3784cfa5c59dba10fb1d36be5f9d983eef6f0fce28b34d4cf0e6?s=96&d=mm&r=g","width":96,"height":96,"caption":"admin"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=116977#webpage","url":"https:\/\/www.vibewire.com.au\/?p=116977","name":"Winter blitz complete, level crossings gone, new stations open","description":"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=116977#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=1#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=116977\/#mainImage","width":2560,"height":1920},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=116977#mainImage"},"datePublished":"2024-08-29T17:42:40+10:00","dateModified":"2024-08-29T17:42:46+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Winter blitz complete, level crossings gone, new stations open","og:description":"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.","og:url":"https:\/\/www.vibewire.com.au\/?p=116977","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg","og:image:width":"2560","og:image:height":"1920","article:published_time":"2024-08-29T07:42:40+00:00","article:modified_time":"2024-08-29T07:42:46+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Winter blitz complete, level crossings gone, new stations open","twitter:description":"The project has delivered eight kilometres of duplicated track, upgrades to Marshall and South Geelong stations.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg"},"aioseo_meta_data":{"post_id":"116977","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/08\/IMG_8288-scaled.jpeg","og_image_width":"2560","og_image_height":"1920","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2025-08-28 21:54:53","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-08-29 07:42:48","updated":"2025-08-28 21:54:53"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tWinter blitz complete, level crossings gone, new stations open\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Winter blitz complete, level crossings gone, new stations open","link":"https:\/\/www.vibewire.com.au\/?p=116977"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/116977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=116977"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/116977\/revisions"}],"predecessor-version":[{"id":116984,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/116977\/revisions\/116984"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/116172"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=116977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=116977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=116977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}