{"id":11686,"date":"2024-02-16T07:50:13","date_gmt":"2024-02-15T21:50:13","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115349"},"modified":"2024-02-16T07:50:13","modified_gmt":"2024-02-15T21:50:13","slug":"making-tracks-at-east-pakenham-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=11686","title":{"rendered":"Making tracks at East Pakenham Station"},"content":{"rendered":"<div id=\"content_container_845755\">\n<p><strong>With work on three <a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/main-street-pakenham\">level crossing removals and new stations at Pakenham and East Pakenham<\/a>\u00a0powering ahead, another huge milestone has been achieved on the project, with the first sections of rail track laid in East Pakenham in its new, permanent position.<\/strong><\/p>\n<p><span id=\"more-115349\"><\/span>In <a href=\"https:\/\/www.railexpress.com.au\/pakenham-power-progresses\/\">June last year<\/a>, the existing tracks were decommissioned and removed, as the construction team installed drainage structures in Deep Creek and Pakenham Creek. They could then get started creating the new East Pakenham Station platforms and pedestrian underpass, which will improve pedestrian access between Sharnet Circuit and Ryan Road.<\/p>\n<p>Once the foundations were ready, the track work happened very quickly.<\/p>\n<p>Overall, the Pakenham project is using 60,000 tonnes of ballast, which is six times the weight of the Eiffel Tower.<\/p>\n<p>The Pakenham level crossing removal team is working closely with Metro Trains as the new track and stations come together.<\/p>\n<p>Metro Trains Senior Project Engineer Rhys Glowaski explained it in greater detail.<\/p>\n<p>&#8220;In East Pakenham we are laying around 6000 sleepers, and on an uninterrupted day we can lay as many as 1600 sleepers.&#8221;<\/p>\n<p>Glowaski said the Pakenham project is using concrete sleepers, replacing the old wooden ones, which have been donated to <a href=\"https:\/\/bigbuild.vic.gov.au\/news\/level-crossing-removal-project\/pakenham-level-crossing-removals-benefit-tourist-railway\">Walhalla Goldfields Railway<\/a>, and old concrete sleepers, donated to\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/news\/level-crossing-removal-project\/pakenham-level-crossing-removals-benefit-tourist-railways\">Yarra Valley Railway<\/a>.<\/p>\n<p>&#8220;Concrete sleepers have a better life expectancy and can handle larger train wheel loads over the traditional timber sleepers,&#8221; he said.<\/p>\n<p>In the coming months, the team will need to \u2018tie in\u2019 or connect the new tracks that have just been built into the existing tracks, so trains can run along the new section of track and service the new East Pakenham and Pakenham stations when they open later this year.<\/p>\n<p>Until then, the team will continue work on the new East Pakenham and Pakenham stations, with construction on the new bus interchange now underway at Pakenham, in front of the station.<\/p>\n<\/div>\n<div data-habitat=\"C1\">\n<div class=\"container\">\n<section class=\"vbb-image-gallery\">\n<div class=\"carousel slide\">\n<div class=\"carousel-inner\">\n<p>The level crossings at\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/main-street-pakenham\">Main Street<\/a>,\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/mcgregor-road-pakenham\">McGregor Road<\/a>\u00a0and\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/racecourse-road-pakenham\">Racecourse Road<\/a> in Pakenham are three of 22 crossings being removed on the Pakenham Line.<\/p>\n<p>2024 is going to be a big year for Pakenham, with the three level crossings gone, new stations open at Pakenham and East Pakenham, and six MCGs worth of community open space created for locals to enjoy.<\/p>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/making-tracks-at-east-pakenham-station\/\">Making tracks at East Pakenham Station<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With work on three level crossing removals and new stations at Pakenham and East Pakenham\u00a0powering ahead, another huge milestone has \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/making-tracks-at-east-pakenham-station\/\">Making tracks at East Pakenham Station<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,163,58],"tags":[],"class_list":["post-11686","post","type-post","status-publish","format-standard","hentry","category-industry-infrastructure","category-rail-industry-news-australia-new-zealand","category-track-construction"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=11686\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Making tracks at East Pakenham Station - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=11686\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-15T21:50:13+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-15T21:50:13+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Making tracks at East Pakenham Station - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#blogposting\",\"name\":\"Making tracks at East Pakenham Station - VibeWire Magazine\",\"headline\":\"Making tracks at East Pakenham Station\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-02-16T07:50:13+10:00\",\"dateModified\":\"2024-02-16T07:50:13+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#webpage\"},\"articleSection\":\"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#listItem\",\"name\":\"Making tracks at East Pakenham Station\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#listItem\",\"position\":3,\"name\":\"Making tracks at East Pakenham Station\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686\",\"name\":\"Making tracks at East Pakenham Station - VibeWire Magazine\",\"description\":\"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \\u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=11686#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2024-02-16T07:50:13+10:00\",\"dateModified\":\"2024-02-16T07:50:13+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Making tracks at East Pakenham Station - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Making tracks at East Pakenham Station - VibeWire Magazine","description":"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=11686","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=11686#blogposting","name":"Making tracks at East Pakenham Station - VibeWire Magazine","headline":"Making tracks at East Pakenham Station","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-02-16T07:50:13+10:00","dateModified":"2024-02-16T07:50:13+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=11686#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=11686#webpage"},"articleSection":"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=11686#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=11686#listItem","name":"Making tracks at East Pakenham Station"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=11686#listItem","position":3,"name":"Making tracks at East Pakenham Station","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=11686\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=11686\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=11686#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=11686#webpage","url":"https:\/\/www.vibewire.com.au\/?p=11686","name":"Making tracks at East Pakenham Station - VibeWire Magazine","description":"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=11686#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2024-02-16T07:50:13+10:00","dateModified":"2024-02-16T07:50:13+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Making tracks at East Pakenham Station - VibeWire Magazine","og:description":"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=11686","article:published_time":"2024-02-15T21:50:13+00:00","article:modified_time":"2024-02-15T21:50:13+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Making tracks at East Pakenham Station - VibeWire Magazine","twitter:description":"With work on three level crossing removals and new stations at Pakenham and East Pakenham powering ahead, another huge milestone has \u2026 The post Making tracks at East Pakenham Station appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"11686","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-22 00:39:32","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-02-15 22:14:22","updated":"2026-05-22 00:39:32"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMaking tracks at East Pakenham Station\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Making tracks at East Pakenham Station","link":"https:\/\/www.vibewire.com.au\/?p=11686"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11686"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11686\/revisions"}],"predecessor-version":[{"id":11687,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11686\/revisions\/11687"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}