{"id":11492,"date":"2024-02-15T07:36:40","date_gmt":"2024-02-14T21:36:40","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=11492"},"modified":"2024-02-15T07:36:40","modified_gmt":"2024-02-14T21:36:40","slug":"brasilia-metro-extension-contract-awarded","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=11492","title":{"rendered":"Brasilia metro extension contract awarded"},"content":{"rendered":"<p>THE government of Brazil\u2019s Federal District (GDF) announced the winner of a Reais 319.7m ($US 64.6m) construction contract to extend Brasilia Metro\u2019s Orange Line on February 7.<\/p>\n<p>The CG\u2013JFJ consortium, formed of CG Constru\u00e7\u00f5es and JFJ Tecnologia em Instala\u00e7\u00f5es El\u00e9tricas will build a 3.6km extension southwest of the existing terminus at Samambaia.<\/p>\n<p>The contract includes the construction of two new stations, plus other fixed installations for the new extension including an electricity substation.<\/p>\n<p>Formal approval of the contract is pending the usual standstill period. If no appeals are lodged, approval and contract signing is scheduled for March, with completion due within four years.<\/p>\n<p>Progress on extending the Orange Line follows operator Metro-DF\u2019s call last month for expressions of interest in a tender to construct a 2.3km extension of the Green Line westwards from its current terminus at Ceilandia, with two new stations.<\/p>\n<p><em>For more details of metro projects across the globe, subscribe to <a href=\"https:\/\/irjpro.com\/\" target=\"_blank\" rel=\"noopener\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/passenger\/metros\/brasilia-metro-extension-contract-awarded\/\">Brasilia metro extension contract awarded<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>THE government of Brazil\u2019s Federal District (GDF) announced the winner of a Reais 319.7m ($US 64.6m) construction contract to extend Brasilia Metro\u2019s Orange Line on [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-11492","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11492"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11492\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}