{"id":11122,"date":"2024-02-14T02:37:01","date_gmt":"2024-02-13T16:37:01","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=11122"},"modified":"2024-02-14T02:37:01","modified_gmt":"2024-02-13T16:37:01","slug":"norfolk-southern-completes-1-billion-infrastructure-improvements-in-2023","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=11122","title":{"rendered":"Norfolk Southern completes $1 billion infrastructure improvements in 2023"},"content":{"rendered":"<p><a href=\"https:\/\/www.norfolksouthern.com\/\">Norfolk Southern Corporation\u2019s (NYSE: NSC)<\/a>\u00a0Engineering team completed\u00a0<span class=\"xn-money\">$1 billion<\/span>\u00a0in infrastructure improvement projects in 2023. Throughout company\u2019s 22-state network comprehensive improvements were made to safety infrastructure, tracks, bridges, and public crossings. This annual investment supports <a href=\"https:\/\/www.norfolksouthern.com\/\">Norfolk Southern\u2019s<\/a> commitment to delivering safe, reliable, and resilient service that customers can depend on.<\/p>\n<p>\u201cOur extensive infrastructure work is an important component of being a customer-centric, operations-driven railroad and represents an investment in the safety of our operations,\u201d said\u00a0<span class=\"xn-person\">Paul Duncan<\/span>, Executive Vice President and Chief Operating Officer. \u201cTo safely deliver reliable and resilient service, our rails, bridges, and structures must be maintained to the highest standards, maximising their productive lifespan.\u201d<\/p>\n<p>In 2023, <a href=\"https:\/\/www.norfolksouthern.com\/\">Norfolk Southern\u2019s<\/a> Engineering team delivered a robust schedule of infrastructure improvement projects, including:<\/p>\n<p>Safety Infrastructure<\/p>\n<p>108 hot box detectors installed<br \/>\n17 acoustic bearing detectors installed<br \/>\n218 CTC to ITCM towers added<br \/>\n2 Digital Train Inspection portals constructed<\/p>\n<p>Tracks<\/p>\n<p>619 track miles of rail work completed, an 8% increase over 2022<br \/>\n2.1 million replacement cross ties installed<br \/>\n1,745 miles of track surfaced<br \/>\n523 panel turnouts and 14 crossing diamonds installed<\/p>\n<p>Bridges<\/p>\n<p>40 bridges replaced<br \/>\n32,743 bridge ties installed<br \/>\n40,398 bridge, culvert, and tunnel inspections completed<\/p>\n<p>Public Crossings<\/p>\n<p>110 grade crossing warning systems added<\/p>\n<p><a href=\"https:\/\/www.norfolksouthern.com\/\">\u201cNorfolk Southern\u2019s<\/a> Engineering team is committed to excellence in everything we do,\u201d said\u00a0<span class=\"xn-person\">Ed Boyle<\/span>, Vice President Engineering. \u201cWorking together as one team, our dedicated railroaders in Maintenance of Way &amp; Structures, Program Maintenance, Communications and Signals, Design and Construction, and Bridges and Structures delivered on-time and on-budget results for our company, customers, and communities. We have our sights set on achieving even greater results in 2024, as we continue to prioritize safety and reliability.\u201d<\/p>\n<p>The <a href=\"https:\/\/www.norfolksouthern.com\/\">Norfolk Southern<\/a> network spans 19,500 route miles across 22 states, serving more than half of the U.S. population and much of the nation\u2019s manufacturing base. Each year, the company undertakes an extensive planning and coordination effort to strategically deliver improvement projects where they are needed most. By strategically investing in the network\u2019s critical infrastructure, <a href=\"https:\/\/www.norfolksouthern.com\/\">Norfolk Southern<\/a> enables trains to move safely with greater speed and reliability. Together, this ensures that customer\u2019s freight is delivered safely and on time.<\/p>\n<div class=\"box\">\n<p><strong>More Like This<\/strong><\/p>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/161384\/siemens-piccadilly\/\">80% of new Piccadilly line trains will be assembled in Yorkshire, Siemens Mobility confirms<\/a><\/h3>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/161044\/darren-caplan\/\">COMMENT: RIA\u2019s Darren Caplan reacts to PAC\u2019s report on HS2<\/a><\/h3>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/161006\/ancala-infrastructure\/\">Ancala announces final close of third flagship infrastructure fund at \u20ac1.4bn<\/a><\/h3>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Norfolk Southern Corporation\u2019s (NYSE: NSC)\u00a0Engineering team completed\u00a0$1 billion\u00a0in infrastructure improvement projects in 2023. Throughout company\u2019s 22-state network comprehensive improvements were made to safety infrastructure, tracks, [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":11123,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[32,47,488],"tags":[],"class_list":["post-11122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-opinion","category-rail-news","category-railway-stations"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11122"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/11122\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/11123"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}