{"id":110289,"date":"2024-08-19T09:48:06","date_gmt":"2024-08-18T23:48:06","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117150"},"modified":"2024-08-19T09:48:06","modified_gmt":"2024-08-18T23:48:06","slug":"contract-awarded-for-level-crossing-removals-in-melton","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=110289","title":{"rendered":"Contract awarded for level crossing removals in Melton"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/08\/LXRP2201-FERRIS-RD-011-news.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p><strong>Four dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts awarded for crossing removals at\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/melton\">Coburns and Exford Roads in Melton, and Ferris and Hopkins Roads in Truganina<\/a>.<\/strong><span id=\"more-117150\"><\/span><\/p>\n<p>A $560 million contract has been awarded to John Holland, Kellogg Brown and Root (KBR), Metro Trains Melbourne, V\/Line, and the Level Crossing Removal Project. This alliance will deliver the new Melton Station and remove the level crossings at Coburns and Exford Roads by constructing a rail bridge.<\/p>\n<p>Additionally, a $229 million contract has been awarded to an alliance comprising Fulton Hogan, Metro Trains Melbourne, V\/Line, and the Level Crossing Removal Project. This team will deliver new road bridges to get rid of the level crossings at Ferris Road, Melton, and Hopkins Road, Truganina.<\/p>\n<p>The removal of the Melton level crossings will also see the introduction of larger nine-car VLocity trains as part of the $650 million Melton Line Upgrade, boosting passenger capacity by 50 per cent. The new Melton Station will feature two additional platforms to accommodate Ballarat train services and the short-starter services that begin and terminate at Melton.<\/p>\n<p>Minister for Transport Infrastructure Danny Pearson spoke about the announcement.<\/p>\n<p><span lang=\"EN-US\">\u201cWe said we\u2019d get it done and we\u2019re not wasting a minute \u2013 getting rid of four dangerous and congested level crossings on the Melton line and improving capacity for people in this growing area,\u201d he said.<\/span><\/p>\n<p>Final designs for all four level crossing removals and the new Melton Station will be released later this year. The new station will have an expansive pedestrian walkway, pick-up and drop-off zones, a new relocated bus interchange, and platform accessibility via lifts and stairs. It will also feature an air-conditioned waiting room, a staffed ticket office, and lighting and security cameras throughout the area.<\/p>\n<p>Since the initial designs were released earlier this year, crews have been on site testing ground conditions with geotechnical drills and preparing for construction, paving the way for a workforce of 550 construction workers from recent crossing removal projects, with works set to begin later this year.<\/p>\n<p>The level crossings will be gone for good in 2026, along with the completion of the new Melton Station, transforming the way locals live, work, and travel.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/contract-awarded-for-level-crossing-removals-in-melton\/\">Contract awarded for level crossing removals in Melton<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/08\/LXRP2201-FERRIS-RD-011-news.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>Four dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/contract-awarded-for-level-crossing-removals-in-melton\/\">Contract awarded for level crossing removals in Melton<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163],"tags":[10376,8],"class_list":["post-110289","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","tag-rail-express","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Victoria&#039;s Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=110289\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Contract awarded for level crossing removals in Melton - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Victoria&#039;s Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=110289\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-08-18T23:48:06+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-08-18T23:48:06+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Contract awarded for level crossing removals in Melton - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Victoria&#039;s Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#blogposting\",\"name\":\"Contract awarded for level crossing removals in Melton - VibeWire Magazine\",\"headline\":\"Contract awarded for level crossing removals in Melton\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-08-19T09:48:06+10:00\",\"dateModified\":\"2024-08-19T09:48:06+10:00\",\"inLanguage\":\"en-AU\",\"commentCount\":1,\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#webpage\"},\"articleSection\":\"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Rail Express, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#listItem\",\"name\":\"Contract awarded for level crossing removals in Melton\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#listItem\",\"position\":3,\"name\":\"Contract awarded for level crossing removals in Melton\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289\",\"name\":\"Contract awarded for level crossing removals in Melton - VibeWire Magazine\",\"description\":\"Image\\\/Victoria's Big BuildFour dangerous and congested level crossings in Melbourne\\u2019s west are one step closer to being gone for good, with contracts \\u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=110289#mainImage\"},\"datePublished\":\"2024-08-19T09:48:06+10:00\",\"dateModified\":\"2024-08-19T09:48:06+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Contract awarded for level crossing removals in Melton - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Contract awarded for level crossing removals in Melton - VibeWire Magazine","description":"Image\/Victoria's Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=110289","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=110289#blogposting","name":"Contract awarded for level crossing removals in Melton - VibeWire Magazine","headline":"Contract awarded for level crossing removals in Melton","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-08-19T09:48:06+10:00","dateModified":"2024-08-19T09:48:06+10:00","inLanguage":"en-AU","commentCount":1,"mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=110289#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=110289#webpage"},"articleSection":"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), Rail Express, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=110289#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=110289#listItem","name":"Contract awarded for level crossing removals in Melton"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=110289#listItem","position":3,"name":"Contract awarded for level crossing removals in Melton","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=110289\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=110289\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=110289#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=110289#webpage","url":"https:\/\/www.vibewire.com.au\/?p=110289","name":"Contract awarded for level crossing removals in Melton - VibeWire Magazine","description":"Image\/Victoria's Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=110289#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=110289\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=110289#mainImage"},"datePublished":"2024-08-19T09:48:06+10:00","dateModified":"2024-08-19T09:48:06+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Contract awarded for level crossing removals in Melton - VibeWire Magazine","og:description":"Image\/Victoria's Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=110289","article:published_time":"2024-08-18T23:48:06+00:00","article:modified_time":"2024-08-18T23:48:06+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Contract awarded for level crossing removals in Melton - VibeWire Magazine","twitter:description":"Image\/Victoria's Big BuildFour dangerous and congested level crossings in Melbourne\u2019s west are one step closer to being gone for good, with contracts \u2026 The post Contract awarded for level crossing removals in Melton appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"110289","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-28 16:34:48","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-28 16:34:48","updated":"2025-08-28 16:34:48"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tContract awarded for level crossing removals in Melton\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Contract awarded for level crossing removals in Melton","link":"https:\/\/www.vibewire.com.au\/?p=110289"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/110289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=110289"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/110289\/revisions"}],"predecessor-version":[{"id":110290,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/110289\/revisions\/110290"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=110289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=110289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=110289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}