{"id":108683,"date":"2024-08-16T07:51:51","date_gmt":"2024-08-15T21:51:51","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=117133"},"modified":"2024-08-16T07:51:51","modified_gmt":"2024-08-15T21:51:51","slug":"works-ramp-up-on-diggers-rest-level-crossing-removals","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=108683","title":{"rendered":"Works ramp up on Diggers Rest level crossing removals"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/08\/Diggers-Rest.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p><strong>Keep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous and congested level crossings in <a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/diggers-rest\">Diggers Rest<\/a>, at <a href=\"https:\/\/www.railexpress.com.au\/level-crossing-removal-underway-in-diggers-rest\/\">Old Calder Highway and Watsons Road<\/a>, with a 22.5m tall piling rig out on site now at Old Calder Highway.<\/strong><span id=\"more-117133\"><\/span><\/p>\n<p>As part of major construction to build the new road bridge at Old Calder Highway, the piling rig is drilling seven holes around 10 metres into the ground. Cylindrical steel reinforcement cages are then dropped in the holes and filled with concrete to create the deep foundations for the bridge structure.<\/p>\n<p>The new temporary diversion road at Old Calder Highway has opened, allowing traffic to continue through the area while we work to build the new roundabout and bridge entrance.<\/p>\n<p>We&#8217;ll set up site offices and work areas later this year at Watsons Road, Diggers Rest.<\/p>\n<p>The level crossings will be removed by building 2 road bridges that will improve traffic flow and safety for locals in Melbourne\u2019s booming north.<\/p>\n<p>The road bridges in Diggers Rest will help boost safety for the 8000 vehicles that use the level crossings each weekday, with 27 trains travelling through each boom gate during the morning peak, creating 36 minutes of boom gate down time.<\/p>\n<p>The new 2 lane road bridge at Old Calder Highway will include a raised cycle path over the rail line.<\/p>\n<p>At Watsons Road, the new 2 lane road bridge will feature a raised pedestrian path. Both bridges will have retaining walls featuring a stone-like pattern, as well as new lighting to improve safety and visibility.<\/p>\n<p>The new bridges will be complete, and the level crossings gone for good in 2025.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/works-ramp-up-on-diggers-rest-level-crossing-removals\/\">Works ramp up on Diggers Rest level crossing removals<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/08\/Diggers-Rest.jpg\" alt=\"\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p>Keep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/works-ramp-up-on-diggers-rest-level-crossing-removals\/\">Works ramp up on Diggers Rest level crossing removals<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,1293,163],"tags":[10376,8],"class_list":["post-108683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-plant-and-equipment","category-rail-industry-news-australia-new-zealand","tag-rail-express","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image\/Victoria&#039;s Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=108683\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image\/Victoria&#039;s Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=108683\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-08-15T21:51:51+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-08-15T21:51:51+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image\/Victoria&#039;s Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#blogposting\",\"name\":\"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine\",\"headline\":\"Works ramp up on Diggers Rest level crossing removals\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-08-16T07:51:51+10:00\",\"dateModified\":\"2024-08-16T07:51:51+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#webpage\"},\"articleSection\":\"Industry Infrastructure, Level Crossing Removal, Plant and Equipment, Rail industry news (Australia, New Zealand), Rail Express, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#listItem\",\"name\":\"Works ramp up on Diggers Rest level crossing removals\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#listItem\",\"position\":3,\"name\":\"Works ramp up on Diggers Rest level crossing removals\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683\",\"name\":\"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine\",\"description\":\"Image\\\/Victoria's Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \\u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=108683#mainImage\"},\"datePublished\":\"2024-08-16T07:51:51+10:00\",\"dateModified\":\"2024-08-16T07:51:51+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine","description":"Image\/Victoria's Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=108683","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=108683#blogposting","name":"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine","headline":"Works ramp up on Diggers Rest level crossing removals","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-08-16T07:51:51+10:00","dateModified":"2024-08-16T07:51:51+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=108683#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=108683#webpage"},"articleSection":"Industry Infrastructure, Level Crossing Removal, Plant and Equipment, Rail industry news (Australia, New Zealand), Rail Express, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=108683#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=108683#listItem","name":"Works ramp up on Diggers Rest level crossing removals"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=108683#listItem","position":3,"name":"Works ramp up on Diggers Rest level crossing removals","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=108683\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=108683\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=108683#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=108683#webpage","url":"https:\/\/www.vibewire.com.au\/?p=108683","name":"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine","description":"Image\/Victoria's Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=108683#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=108683\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=108683#mainImage"},"datePublished":"2024-08-16T07:51:51+10:00","dateModified":"2024-08-16T07:51:51+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine","og:description":"Image\/Victoria's Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=108683","article:published_time":"2024-08-15T21:51:51+00:00","article:modified_time":"2024-08-15T21:51:51+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Works ramp up on Diggers Rest level crossing removals - VibeWire Magazine","twitter:description":"Image\/Victoria's Big BuildKeep your eyes peeled for a new piece of machinery on the project which will help to remove two dangerous \u2026 The post Works ramp up on Diggers Rest level crossing removals appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"108683","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-28 15:28:40","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-08-28 15:28:40","updated":"2025-08-28 15:28:40"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tWorks ramp up on Diggers Rest level crossing removals\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Works ramp up on Diggers Rest level crossing removals","link":"https:\/\/www.vibewire.com.au\/?p=108683"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/108683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=108683"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/108683\/revisions"}],"predecessor-version":[{"id":108684,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/108683\/revisions\/108684"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=108683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=108683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=108683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}