{"id":10102,"date":"2024-02-09T18:37:44","date_gmt":"2024-02-09T08:37:44","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=10102"},"modified":"2024-02-09T18:37:44","modified_gmt":"2024-02-09T08:37:44","slug":"new-waiting-shelters-set-to-be-installed-across-21-northern-stations-thanks-to-1-9m-investment","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=10102","title":{"rendered":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment"},"content":{"rendered":"<p>A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by <a href=\"https:\/\/www.northernrailway.co.uk\/\" target=\"_blank\" rel=\"noopener\">Northern<\/a>.\u00a0\u00a0<\/p>\n<p>Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating.\u00a0<\/p>\n<p>Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations across the network is extremely important to us. Even small changes like installing a new shelter can have a big impact on our customers using the Northern network.\u00a0<\/p>\n<p>Work will begin this month and will finish in early summer.\u00a0<\/p>\n<p>The following stations are included in the scheme: Aspatria (2), Bare Lane (1), Belle Vue (2), Bramley (2), Chassen Road (2), Cherry Tree (2), Clitheroe (2), Conisbrough (2), Denby Dale (1), Humphrey Park (2), Kildale (1), Lockwood (1), Long Preston (2), Northwich (1), Pleasington (2), Ryder Brow (2), Shipley (1), Widnes (2), Woodlesford (2), Redcar Central (2) and Prudhoe (1).\u00a0<\/p>\n<p><em>Photo credit: Northern <\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern.\u00a0\u00a0 Once [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":10103,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[7,11],"class_list":["post-10102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-transport","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=10102\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=10102\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-02-09T08:37:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-02-09T08:37:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#blogposting\",\"name\":\"New waiting shelters set to be installed across 21 Northern stations thanks to \\u00a31.9m investment - VibeWire Magazine\",\"headline\":\"New waiting shelters set to be installed across 21 Northern stations thanks to \\u00a31.9m investment\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Northern-pic-150x150-tkcyg0.jpeg\",\"width\":150,\"height\":150},\"datePublished\":\"2024-02-09T18:37:44+10:00\",\"dateModified\":\"2024-02-09T18:37:44+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#webpage\"},\"articleSection\":\"Rail News, transport, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#listItem\",\"name\":\"New waiting shelters set to be installed across 21 Northern stations thanks to \\u00a31.9m investment\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#listItem\",\"position\":3,\"name\":\"New waiting shelters set to be installed across 21 Northern stations thanks to \\u00a31.9m investment\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102\",\"name\":\"New waiting shelters set to be installed across 21 Northern stations thanks to \\u00a31.9m investment - VibeWire Magazine\",\"description\":\"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \\u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \\u201cInvesting in upgrades to stations\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Northern-pic-150x150-tkcyg0.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102\\\/#mainImage\",\"width\":150,\"height\":150},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=10102#mainImage\"},\"datePublished\":\"2024-02-09T18:37:44+10:00\",\"dateModified\":\"2024-02-09T18:37:44+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine","description":"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations","canonical_url":"https:\/\/www.vibewire.com.au\/?p=10102","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=10102#blogposting","name":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine","headline":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Northern-pic-150x150-tkcyg0.jpeg","width":150,"height":150},"datePublished":"2024-02-09T18:37:44+10:00","dateModified":"2024-02-09T18:37:44+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=10102#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=10102#webpage"},"articleSection":"Rail News, transport, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=10102#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=10102#listItem","name":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=10102#listItem","position":3,"name":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=10102\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=10102\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=10102#webpage","url":"https:\/\/www.vibewire.com.au\/?p=10102","name":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine","description":"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=10102#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Northern-pic-150x150-tkcyg0.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=10102\/#mainImage","width":150,"height":150},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=10102#mainImage"},"datePublished":"2024-02-09T18:37:44+10:00","dateModified":"2024-02-09T18:37:44+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine","og:description":"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations","og:url":"https:\/\/www.vibewire.com.au\/?p=10102","article:published_time":"2024-02-09T08:37:44+00:00","article:modified_time":"2024-02-09T08:37:44+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment - VibeWire Magazine","twitter:description":"A total of 35 new waiting shelters are set to be installed across 21 stations as part of a \u00a31.9 million investment by Northern. Once finished the new shelters will be partially enclosed, providing customers with shelter from the elements and bench seating. Craig Harrop, regional director at Northern, said: \u201cInvesting in upgrades to stations","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"10102","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-21 12:26:46","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-02-09 18:51:14","updated":"2026-05-21 12:26:46"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNew waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"New waiting shelters set to be installed across 21 Northern stations thanks to \u00a31.9m investment","link":"https:\/\/www.vibewire.com.au\/?p=10102"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/10102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10102"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/10102\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/10103"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}